Construction Support Services

by
Standard Design and Construction Guidelines for Microtunneling Committee


Part of: Standard Design and Construction Guidelines for Microtunneling

Abstract:

A preconstruction survey of existing structures within the anticipated construction zone of influence should be conducted before any construction begins. A plan for structures that need protection should be prepared before construction begins. A postconstruction survey should be conducted. Any major discrepancy should be reported.



Subject Headings: Construction management | Surveys (non-geomatic) | Protective structures | Existing buildings

 

Return to search