Assessment of Sediment Problems in Peoria Lake, Illinois
Peoria Lake, located on the Illinois River in Illinois, is the deepest lake in the river valley. Since 1903, the lake has experienced approximately a 31% loss of original storage capacity...

Computer-Based Data Acquisition, Analysis and Control: A Minicomputer System
The Environmental Fluid Mechanics Laboratory (EFML) employs two computer systems for the purpose of data acquisition, analysis and control. The first, an HP-2100 system, is used primarily...

Feasibility Assessment, Planning and Programming of Downtown People Mover Installations
Based on the author's personal experience, this paper sets forth suggested guidelines for progressing from initial feasibility studies through implementation of automated...

How Will People Movers Affect Downtown Areas?
The year 1980 was a pivotal one for the downtown automated people mover development process in both Detroit and Miami. In that year both cities completed their preliminary engineering/environmental...

Urban Experience with AGT in North America
This paper gives a brief historical review of events behind the four Automated Guideway Transit (AGT) system deployments which are approaching public operations during 1985 and 1986. Particular...

Safety Aspects of Detroit DPM Station Designs
The Detroit Downtown People Mover (DDPM), currently under construction in the Central Business District of downtown Detroit, offered a unique set of challenges to the architects and engineers...

Unique Considerations in the Detroit DPM Foundation Design
Foundation design for the guideway of Detroit's Downtown People Mover (DPM) was influenced by a variety of unique considerations. Severe loading conditions were created by...

Unique Features of Automated People Mover Systems
This paper identifies the characteristics and unique features of the automated transit system presently being installed in the central business district of Detroit, Michigan. This system...

Downtown People Mover System Security: Detroit and Miami Responses
The Detroit and Miami downtown people mover (DPM) systems will be in uncontrolled environments in major urban central business districts. Both plan not to have personnel on vehicles or...

Detroit's DPM Maintenance and Control Facility
The Maintenance and Control Facility (MCF), a single building complex for the Detroit Downtown People Mover (DPM) system, incorporates the people mover system's transit vehicle...

Downtown People Mover Operating and Maintenance Personnel Requirements
Two major automated Downtown People Mover (DPM) projects, Miami and Detroit, are expected to be in operation within a year. These two DPM systems are similar in many respects: automation,...

Flint Tunnel?A Project of Change and Challenge
The talk will deal with construction of a 12' diameter (8. 5' finished) tunnel in the City of Flint, Michigan. This 5-mile long sewer tunnel was constructed through...

Design and Construction of Terror Lake Dam
Terror Lake Dam is a central feature of the 189 million Terror Lake Hydroelectric Project, located on Kodiak Island Alaska. The dam is a 193-feet (59 m) high concrete-faced zoned rockfill...

Foundation Design Considerations for Detroit DPM
The design loadings for support of the elevated guideway of the Detroit Downtown People Mover (DPM) consist of high vertical as well as horizontal loads. In order to simplify foundation...

Tunneling Operations and Equipment
The papers included in the Proceedings describe four diverse tunneling prjects of varying diameters, design criteria, ground conditions and construction techniques undertaken at locations...

Structural Design, Cementitious Products, and Case Histories
The papers in this book represent deverse topics in structural engineering. In design of beam-columns by the AISC interaction equations, it is demonstrated that an inadequacy exists when...

Transportation '85
Abstracts
Abstract only. The abstracts are presented of the papers presented at the 16 Sessions of the Conference, Transportation 85. The papers relate to the following session topics: CAD (ADS,...

Cost-Effective Design for Urban Lakes Dredging
The design of a dredging project for an urban lake is usually more complex than for lakes in rural areas. Three areas are special problems particular to the urban lake: chemical quality...

Agricultural Crop Production and Quality Effects when Soils are Amended with Dredged Lake Sediments
Lake renewal achieved by pumping loose sediment from the lake bottom requires a disposal area for that sediment and the associated water. Application of this sediment to agricultural land,...

Confined Disposal in the Canadian Great Lakes
The dredging activities of Public Works Canada, Ontario Region, extend over most of the Canadian Great Lakes thereby significantly impacting on its environment. The paper presents a brief...

 

 

 

 

Return to search