Value Engineering Changes to the Eastside Pipeline
Value Engineering is a process of applying analytic, creative and evaluative techniques to a project in order to make recommendations that will, when implemented, maximize value and quality...
The Secondary Inlet of the Eastside Pipeline Project
The subject of this paper is a design feature included in the current capital improvement program of the Metropolitan Water District of Southern California. This feature, the Secondary...
Modeling Groundwater Response to a Perimeter Flood
A large industrial facility in the west of France was impacted by a flood in January 1995. Costs associated with the disruption in one week of production were estimated at $15E6 US. In...
Dynamic Analysis of Multi-Pool Irrigation Canal
This paper discusses the dynamic characteristics of an open multi-pool irrigation canal from robustness point of view. In particular, the presence of right-half plane zeros in an open...
System Downstream Control for On-Demand Irrigation Canals
A nonlinear programming (NLP) Model has been developed to assist downstream control for optimal control of canal systems, called system downstream control (SDC). The objective of system...
Successful Implementation of Grouted Boulder Grade Control Structures on Drainageways in the Denver Metropolitan Area
This paper describes the development of design guidelines for the Grouted Sloping Boulder drop structure as an alternative for the sloping riprap drop structure. A number of partial failures...
Groundwater Remediation Design When Pretty Good is Good Enough
This paper introduces some new approaches toward the optimal design of groundwater remediation systems or any other engineered systems. These new approaches primarily consist of making...
Application of the Newton Method in Valve Discharge Coefficient Relationships
This paper presents a methodology that utilizes the Newton Method to compute the dimensionless valve discharge coefficient Cd from a manufacturers valve discharge coefficient Cv. The implicit...
Liability of Engineers When Wetlands Laws Change
Engineers who perform wetlands delineations or design facilities in wetlands areas are increasingly sued in court when wetlands laws or regulations change. Owners and developers whose...
Upper Chehalis River Pollutant Capacity and Load Allocations
Dry season water quality was evaluated in the Upper Chehalis River in western Washington state, focusing on low dissolved oxygen (DO), and using the Total Maximum Daily Load (TMDL) process....
White River Fish Screen Project Planning and Design
In 1983, Puget Sound Power and Light Company (Puget Power) submitted a license application to FERC for the overall White River Project. One of the elements of the project application was...
1995: Where the Past (Paleoflood Hydrology) Meets the Present, Understanding Maximum Flooding
Paleoflood hydrology has become accepted in the scientific, engineering, and regulatory communities and increasingly is being used to complement engineering hydrology throughout the Rocky...
Scour Study for Bridge Design on Temecula Creek
Channel-bed scour was studiedfor the proposed new Pala Road Bridge on Temecula Creek in Riverside County, California. In order to determine the general scour, sediment transport and potential...
Optimization of a Ground-Water Injection/Extraction System
This paper describes the application of linear programming to optimize the number, location, and rates of extraction/injection for a pump and treat system at a groundwater remediation...
Salinity and Hydraulic Issues at a Constructed Wetlands
A constructed wetlands at Boulder City, Nevada was designed to use effluent pumped from the City's wastewater treatment plant. The design was complicated by the highly permeable...
CSO Planning Model Development and Verification Strategy
A model verification technique is described that uses modeled and monitored overflow occurrences defined in terms of the same long-term frequency statistics that are used to evaluate CSO...
Pipe Network Analysis and Design in Developing Regions. Case Study: Novokuznetsk, Siberia
Pipe network analysis, design and optimization in developing countries poses some unique problems, yet, is of paramount importance. Under these conditions, there is frequently only sparse...
Design of Riparian Habitat Replacement in Active Floodplains
Conventional flood control engineering techniques and approaches that have been traditionally been applied are now challenged by the public and no longer readily available as floodplain...
Physical Distribution System Models for Assessing the Impact of Water Quality on Regrowth and Corrosion
Over the past several years, there have been several new and proposed Safe Drinking Water Act (SDWA) regulations that will require many water utilities to modif treatment operations to...
Overview of the US Army Corps of Engineers Flood Control Channels Research Program
The objective of the Flood Control Channels Research Program, currently being conducted at the US Army Engineer Waterways Experiment Station, is to develop design guidance and systematic...
Return to search