Uncertainty Quantification in Water Distribution Parameter Estimation
Calibration for water distribution system model parameters is usually undertaken with a minimal amount of field measurements so additional pseudomeasurements are assumed. Both the actual...

Measurements to Calibrate Suspended Sediment Model for Adsorbed Contaminant Transport Study of North Fork Holston River, Virginia
A daily suspended sediment (SS) and mercury transport model was developed for a 25-mile reach of the North Fork Holston River below Saltville, Virginia. Daily streamflow measurements;...

Routing for Lake and Tidal Canal Drainage System
A routing method is presented for lake and tidal canal interconnected drainage system in coastal urban areas. Combing reservoir routing, channel routing, and discharge computation of the...

Management of Water Resources Distribution in Iran
On the basis of 45th principle of the Iranian Constitution, seawater as well as river waters, streams and any other natural course, whether surface or underground, also floods, wastewaters,...

Daily Drought Monitoring by the Use of Existing Hydrologic Records
To manage water efficiently in case of drought, an effective drought monitoring method has been of interest. Drought durations and their conditional probabilities are estimated by applying...

Effect of Manning's Roughness Coefficient in Simulating Flow Parameters in Natural Channels
Manning's roughness coefficients are presented for three of the oldest and largest irrigation canals in Egypt. The discharges ranges from 35 to 318 m3/s....

Drought-related West Tennessee Channel Bank Failures
Massive bank failures occurred in 1988 along a 14-kilometer reach of the lower Obion River channel in Dyer County, West Tennessee where the river flows through an abandoned Mississippi...

Fluvial Recharge of Sand Mining Pit
Accuracy in modeling fluvial processes becomes increasingly important as development occurs along waterways. The FLUVIAL-12 (1, 2) model is used to simulate the recharge of sand mining...

Safety Analysis of Handset Wood Slab Formworks
A reliability index is calculated for flexural strength of a handset wood slab formwork system. Load and resistance models are based on a survey of construction loads and wood test data...

Construction Product Performance, The Unexpected
Efforts made in the construction, industry to increase the quality of the constructed facility through the development of new materials and systems and through the reduction of labor intensive...

Construction Accident Analysis: The Inductive Learning Approach
This paper presents the use of inductive learning in the analysis of construction accidents. It provides a brief description of ROUGH, an inductive system based on the theory of rough...

Computer Assisted Design and Construction
This paper presents a comprehensive package for conducting structural analysis, design, and project management on microcomputers. Several examples are presented to illustrate the usefulness...

Project Controls for Denver International Airport
Managing a $2 billion dollar construction program requires a unique application of tried and true control systems and provides an opportunity to innovate new methods. The Program utilizes...

Project Controls on the Channel Tunnel Project
Establishing controls for a multi-facted, multi-billion dollar, privately financed, project which is run by two organisations created solely for that one project has been a major challenge....

Design of Large Project Permit Management System
This paper provides a brief overview of the functional specifications for a Permit Tracking and Evaluation System (PTES) which is interfaced to the master schedule of design and construction...

A Framework for Reasoning About CAD Data
A system capable of reasoning about CAD data offers the opportunity to substantially improve a design or a construction plan by providing feedback about an engineer's artifact. This paper...

Integration of CAD and Knowledge-Based Systems?An AI Architecture
This research focuses on the use of CAD-KBSs integration as a tool for increasing constructability in design and accomplishing construction management functions. Beyond the drafting ability,...

Reasoning for Data Integration
Improving the inter-disciplinary communication of design and construction data is an important objective in improving the competitiveness of our construction industry. This paper discusses...

Requirements of Object-Oriented Databases for Supporting Collaborative Engineering
Object-oriented programming is gradually evolving into a popular and standard paradigm for large software application development. Typical examples include computer-aided design and engineering...

Automating Project Scheduling?A Case Study
This paper describes the on-going development of a 'finite element' based, project planning and scheduling package which uses knowledge bases, inference engines,...

 

 

 

 