Updating the New York City Water System
The New York City Bureau of Water Supply maintains extensive records of all water main breaks dating back at least as far as 1940. A computerized file of the main break records was prepared...

Assessment of Drainage Infrastructure for Urban Areas
Public concern about the adequacy of the urban drainage system rises and falls with the rainfall patterns. Because the 'problem' depends on many variables, including...

The Practitioner's Approach to Infrastructure Master Planning: The State of the Art
Infrastructure master planning is still a disjointed practice, but recent empirical work provides a base from which coordinated efforts, tying together the various sectors, are possible....

Integrating Infrastructure Planning with Master Planning: A Review of Concepts and Methods
The concept of urban master planning is reviewed in introduction. Next, the nature of the interrelationships between infrastructure elements, other physical elements, and urban activities...

Making Sense of Politics, Planning and Engineering
Rapidly expanding urban areas generally undergo a great deal of public and political debate regarding whether or not population expansion is good or bad and the effects of such expansion...

Legislative Trends Affecting the Funding of Public Works
The paper reviews key factors that will shape legislative consideration of measures to provide infrastructure to support urban growth and to maintain existing public facilities. The discussion...

Automated People Movers
Engineering and Management in Major Activity Centers
The high levels of interest currently being shown by a number of cities and special land uses indicates that automated people movers (APM) have established a secure position on the spectrum...

Reducing Failures of Engineered Facilities
One of the most serious problems of modern professional practice is the collapse or malfunction of an engineered facility. The tragic consequences of this problem are all too familiar...

Construction Research Applied to Practice
The five papers compiled in these proceedings of the ASCE technical session Construction Research Applied to Practice represent important contributions to the construction industry. Four...

Tunneling Operations and Equipment
The papers included in the Proceedings describe four diverse tunneling prjects of varying diameters, design criteria, ground conditions and construction techniques undertaken at locations...

Avoiding Contract Disputes
Contract disputes among parties involved in the construction project are very expensive in both time and dollars. Owners, designers, construction managers and contractors all share in...

Vibration Problems in Geotechnical Engineering
This volume constitutes the Proceedings of a two-session Symposium whose main objective is to address geotechnical issues related to vibration problems other than those associated with...

Making Project Control Systems Work
This publication contains four papers that offer both theoretical and practical advice on how to make control systems more effective on design and construction projects. The use of automated...

Putting CADD to Work
Case histories show that engineering with CADD is no longer experimental. Projects reviewed in this article include an office/shop building for an electrical utility, a flood plain site...

Project Management on a Micro
Increasingly, project management programs that once required the power of a mainframe computer are being modified to work on micros. Some of the programs being used at a number of firms...

Accounting for CADD Center Costs
The purpose of developing a CADD cost center is to segregate all costs related to the CADD operation so that you may receive fair compensation for CADD usage and to ensure fair charges...

Second-Guessing the Engineer
The relationships between utilities and the bodies that regulate them have changed drastically in the past few years. No longer can any costs associated with the construction of new power...

Rail Planning�Texas Style
The Dallas Area Rapid Transit (DART) Authority has a 25 year plan to build a 147 mile rail network�all without federal funds. When DART hits its 2010 target date for completing the rail...

Highway Work Zone Safety
The objective of this presentation is to provide discussion on how to improve the interdisciplinary information exchange to enhance safety on roads and streets from the viewpoint of the...

Engineering with Fabric
Geotextiles are lending their strength to construction projects where conventional methods won't work. At Washington National Airport, an embankment was built into the Potomac...

 

 

 

 

Return to search