Asphalt Update
Of the $150 million spent in the five-year Strategic Highway Research Program (SHRP), $50 million went to research to improve the durability and cost-effectiveness of asphalt pavements--on...

Start the Presses!
Turning an existing bleach manufacturing facility into a printing plant required careful structural design to support a wide range of production processes. The new Daily News facility...

Hydraulics of Subsurface Flow Constructed Wetlands
Resistance to flow through subsurface flow wetlands is described by Darcy's law or by Ergun's equation. Both representations are combined with the continuity...

Application of a Hydrodynamic Model in Design of the Kingman Lake Wetland Restoration Project
The U.S Army Corps of Engineers Baltimore District is restoring 45 acres of wetlands within Kingman Lake in the District of Columbia through the placement of dredged material from the...

Hydraulic and Engineering Considerations in Designing Constructed Treatment Wetlands for a Lake Restoration
A 12,600 ha (31,000 acre) hypereutrophic lake in central Florida is being restored by constructing a 2,020 ha (5,000 acre) wetland filter to remove suspended sediments and particulate...

Water Control Structure Choice for Wetland Restoration/Creation
Ducks Unlimited is a non-profit conservation organization, whose mission is to fulfil the annual life cycle needs of North American waterfowl by protecting, enhancing, restoring, and managing,...

Siting of Grade Control Structures
In siting a grade control structure in a stream, hydraulic considerations must be integrated with other important siting factors. A review of several of the important siting factors is...

White River Fish Screen Project?Hydraulic Modeling
In 1983, Puget Sound Power and Light Company (Puget Power) proposed in a license application to FERC for the overall White River Project replacement of the existing fish screens constructed...

Engineering Features of the Red Bluff Research Pumping Plant
In 1995, the construction of the Red Bluff Research Pumping Plant (RBRPP) was completed. The pumping plant is a research facility for evaluating the biological/engineering features of...

Dam Foundation Erosion Study: The Design of a Sidewall Orifice for Simulation of a Free Trajectory Overtopping Jet
This paper describes the design of a sidewall discharging orifice for simulation of a free trajectory overtopping jet. A sidewall orifice discharges through the sidewall of a pipe. The...

Genetic Algorithm Design of Piped Irrigation Systems
The design of piped irrigation systems is a complex matter. In its simplest form it involves the selection of the sizes of pipes and other hydraulic elements so as to ensure that the varying...

Efficient Pump Representation for Fixed-Grid MOC in Pipeline Systems
An explicit solution of the pump power failure boundary condition is shown to have many computational advantages over the conventional implicit pump boundary condition solution (i.e.,...

Effects of Approach Flow Conditions on Pump Sump Design
An important obstacle to the development of a generalized sump design is the variability of flow conditions in approach areas. The geometry and alignment of the areas immediately upstream...

Santa Ana River Salt Marsh Restoration: Orange County, California, U.S.A.
As part of the All-River Plan of the Santa Aria River, the 92 acre Santa Ana River Marsh (Marsh) was constructed at the Pacific Ocean outlet in Orange County, California. This project...

Grade-Control Structures for Salt River Channelization
Soil cement grade-control structures have been designed and constructed in conjunction with channelization projects along the Salt River in Phoenix, Arizona. The structures were designed...

A Surface Collection Design Approach on the Lower Columbia River
Surface collection and bypass of downstream migrating juvenile salmon has the potential to help improve the survival of the Columbia River salmon population. However, surface passage on...

Surface Bypass-Collector Concepts and Performance
Surfacetype bypass collectors and concepts are described. Biological and engineering requirements to pass juvenile salmonids at Snake?Columbia River dams are presented. The components,...

Value Engineering Changes to the Eastside Pipeline
Value Engineering is a process of applying analytic, creative and evaluative techniques to a project in order to make recommendations that will, when implemented, maximize value and quality...

The Secondary Inlet of the Eastside Pipeline Project
The subject of this paper is a design feature included in the current capital improvement program of the Metropolitan Water District of Southern California. This feature, the Secondary...

Rehabilitating Arctic Tundra in Alaska
During the past 25 years, there has been significant progress in tundra rehabilitation. Initially, agronomic practices requiring large quantities of grass seed and fertilizer were believed...

 

 

 

 

Return to search