Quality Control: Bridge Steel Fabrication and Erection
This paper examines the Quality Control Program Plan (QCPP) developed by Frederic R. Harris, Inc. (FRH) for fabrication and erection inspection of over 5,448,000 kg of AASHTO Fracture...

Infrastructure
Planning and Management
This proceedings, Infrastructure Planning and Management, consists of papers presented at two parallel conferences held in Denver, Colorado,...

LRFD for Timber Structures
The use of load and resistance design (LRFD) methodologies is increasingly becoming the standard analysis procedure for engineering design. The concrete industry has used a variation of...

The Use of Structural Composites in 21st Century Infrastructure Technology
The purpose of this paper is to create and transmit a sense of the unique benefits which effective application of composites technology can bring to the civil engineering. infrastructure...

Infrastructure, IFC-Style
Interview with Everett J. Santos, head of the infrastructure department at the International Finance Corp.�the World Bank's private-sector arm. The department, created in...

Private Financing for Infrastructure
From the United States to Germany and the Third World, financing has replaced the availability of technology and expertise as the main infrastructure problem. Public deficits, resistance...

The Mightiest of Them All
Memories of Grand Coulee Dam
The Mightiest of Them All: Memories of Grand Coulee Dam presents the experiences of L. Vaughn Downs from the time he started working on the...

The Bechtel Edge
The Bechtel Group can commit personnel all over the world to seek out and scrutinize business opportunities, and the firm is usually at the top of Engineering News-Record's...

Bridging the Gulf
The Gulf War and saturation of traditional Middle Eastern markets have prompted Western firms to look into the United Arab Emirates, the wealthiest of the small states around the Arabian...

High Performance Construction Materials and Systems
An Essential Program for America and Its Infrastructure?Technical Report
This report, High Performance Construction Materials and Systems: An Essential Program for America and Its Infrastructure - Technical Report...

High-Performance Construction Materials and Systems
An Essential Program for America and Its Infrastructure?Executive Report
Prepared by American Concrete Institute; American Institute of Steel Construction; American Iron and Steel Institute; ASCE; Civil Engineering Research Foundation; Concrete Research and...

Federal Public Works Infrastructure R&D
A New Perspective
Prepared by the Civil Engineering Research Foundation. This report provides an analysis of the federal role in public works infrastructure research...

Elected Officials
Schools and organizations train engineers to use facts. But, engineers are often content to base decisions on their opinions. While engineering judgment is an important part of the professional...

Infrastructure and Our Values (or How to Build for the Next 2000 Years)
Good ideas are everywhere. The challenge for civil engineers is to find them. When we do find them the real work begins. Then we must translate ideas into civil engineering....

Design and Proposed Construction Techniques for Pangue Dam
The paper describes the site conditions, design and proposed construction methods for the 115 m high Pangue Dam, Chile's first RCC dam. Trial mix design work and test embankments...

The Construction of New Victoria Dam, Australia
The paper discusses various aspects of the construction of the New Victoria Dam, a 52 m high, high-paste content RCC dam constructed near Perth, Western Australia. The mix design and its...

The Design and Construction of Shuikou Project RCC Diversion Wall
Shuikou Hydroelectric Project, currently under construction on the Minjiang River in the People's Republic of China is a concrete gravity dam having a maximum height of 101...

A Review of Design Criteria for High RCC Dams
The 1980s could be considered to be the decade during which roller-compacted concrete dams came of age. This economic method of construction is sufficiently proven that very large dams...

Performance of Upper Stillwater Dam
Upper Stillwater Dam was constructed with roller compacted concrete (RCC) and horizontally slipformed facing. This unique construction method for a concrete gravity dam included no contraction...

Lessons Learned from Elk Creek Dam
This is the third of a series of papers published on the design and construction of Elk Creek Dam. The first paper discussed design and construction concepts to provide water tightness...

 

 

 

 

Return to search