Developing a Privately Owned Utility in Florida: Financing and Cash Flow
Private developers of a 5,000-acre master-planned community in Sarasota, Florida, were required to provide their own wastewater treatment plants as a condition for obtaining permits. After...

An Analysis of the Impact of Weather Variation on Monthly Water Demand
A methodology is utilized to analyze and model the impact of weather variation on monthly long distance water deliveries in Southern California. Monthly water demand is viewed as a combination...

The Multi-Watfore Method: A Water Demand Forecasting System
The multi-Watfore method, which combines the cascade model and a first order analysis of uncertainty, is a system of practical steps to develop models of water demand while generating...

Preliminary Report of the Feasibility of an Interbasin Water Transfer Through Existing Canal Systems
A preliminary feasibility study of the interbasin transport of water from the Sabine River on the Texas Louisiana border to the San Jacinto River Basin, northeast of Houston, Texas, using...

Sediment Management Challenges of the Red River Waterway Project
The Red River Waterway project consists of channel stabilization and construction of navigation locks and dams to provide a 9 foot minimum depth for a distance of approximately 236 miles,...

The Development of Lake Granbury SWATS Regional Electrodialysis Reversal Demineralizer Treatment Plant
Due to high population growth and rapidly declining groundwater levels, the Brazos River Authority of Texas initiated a regional study to evaluate existing and potential surface water...

Developing a Wastewater Plan for an Urbanizing Area?The Case of Johnson County, Texas
Johnson County, Texas, is located south of Ft. Worth, Texas, and is influenced by the entire Dallas-Ft. Worth Metroplex, which has a population of more than 3 million people. In 1988 the...

Financing Water Supply and Wastewater Facilities in Low Income Areas
The Texas Water Development Fund was created by amendment to the Texas Constitution in 1957 as a reaction to the droughts of the 1950's. Subsequent amendments to the Texas...

The Spirit of Bandera?An Experiment in Inter-Agency Team-Building
An experiment to improve intergovernmental cooperation in water resources planning and management was initiated by the Southwestern Division, U.S. Army Corps of Engineers, in 1988 at Bandera,...

Conservation and Water Supply Planning at Army Installations
The purpose of this paper is to summarize the research being conducted by the U.S. Army Institute for Water Resources in providing technical assistance to the Installation Planning Division,...

Wastewater Balance for Storage Pond at Land Treatment Site
Land application is an established method for treating municipal wastewater in the United States. Most land application operations include on-site facilities to store wastewater during...

Using Corps of Engineers' Reservoirs for Water Supply
This paper provides an historical overview of the Corps of Engineers (COE) authority in the water supply arena and discusses the methodologies and procedures used to reallocate storage...

Simulation of a Surface Water Allocation System
This paper outlines the water rights system in Texas and a newly developed computer simulation program for modeling this system. In addition, an overview of a river basin simulation using...

Ute Mountain Ute Indian Water Rights Settlement of 1988
The Ute Mountain Ute Tribe, located in the southwest corner of Colorado, agreed to a negotiated settlement of Winters Doctrine Water Rights rather than pursuing litigation. The Tribe will...

Administration of the Pecos River Compact Between New Mexico and Texas
The Pecos River Compact specifies the allocation of water between New Mexico and Texas. Due to difficulty in reaching agreement Texas sued New Mexico in the Supreme Court. The Court issued...

Water Rights, Water Development, & Growth Issues in Goleta, California
The Goleta Valley and Santa Barbara areas of southern California are highly desirable places to live. In the past, relatively uncontrolled growth of the Goleta Valley area led to a gradual...

Water Development Ideology: A New Status Quo
The old ideology of economic growth used to justify water resource development is no longer popular in the Southwest. A new ideology is developing, based on new circumstances....

Water for Houston: The Wallisville Case
The multipurpose Wallisville project included an industrial water supply for Houston. The project was nearly 70 percent complete when environmentalists succeeded in stopping construction...

Environmental Permitting a Major Expressway Facility in Florida
As general consultant to the Tampa-Hillsborough County Expressway Authority, Howard, Needles, Tammen and Bergendoff (HNTB) was responsible for the environmental permitting required for...

Stormwater Management Planning for the Rush Creek Watershed, Arlington, Texas
Persistent planning focused through the City of Arlington and a Citizen Stormwater Management Implementation Committee has initiated the developed of a City stormwater management program...

 

 

 

 

Return to search