A Pilot Sounding Rocket Project Utilizing Student Labor
Space science experiments have been accomplished by suborbital, sounding rockets for over forty years. This inexpensive, reliable, and unique launch platform provides the basis of a state-wide...
Using Simulation to Evaluate On-Orbit Construction Operations
As the NASA Space Exploration Initiative (SEI) program contemplates a permanent presence on both the Lunar and Martian soil, the necessity for On-Orbit Construction of the Earth-to-Lunar/Martian...
Characteristics of High-Speed Runway Exits for Airport Design
This paper addresses some of the geometric design and operational characteristics of high-speed runway exists. Lateral and longitudinal runway constraints limiting the use of high-speed...
The Army Aviation Team from a Military Civil Engineer's Perspective
The Technical Session for which this paper is written is 'Airfield Pavements - A Team Effort.' As such, the emphasis on this paper is the United States Army Aviation Team, and not the...
An Economic Evaluation of the Thunder Bay Air Terminal Development Strategies
The Air Terminal Building (ATB) at the airport in Thunder Bay, Ontario, Canada is currently being utilized at approximately 140% of its design capacity. In response, three alternative...
The New Munich Airport?Planning, Construction and Opening of a New International Turnstile Airport in Europe
The new Munich airport that began operations just recently dates back to the mid-1950. The paper discusses the general expansion plan which includes site selection; runway system planning;...
New Seoul Metropolitan Airport
The New Seoul Metropolitan Airport (NSMA), to be built on a man-made island near Seoul, Korea, will have access to the city by bridge, rail, and dedicated freeway. When completed, NSMA...
City and County of Denver Approach to Management Requirements
Construction of large infrastructure projects has become increasingly rare since the 1960's. In fact, America has not built a new airport since 1974. While sparse funding is certainly...
Management of Design
Denver's new airport uses the services of over 80 separate design firms. The existing airport, Stapleton, could not be expanded to meet the forecasted demand of 1,200,000 operations with...
Construction Approach to Denver International Airport
The new Denver International Airport, a $2.7 billion project, is being designed and constructed under the oversight and guidance of a Program Management Team (PMT) led by the City and...
Airport Landside Management: An Unique Airport Specialty
Air transportation has become a common and preferred method of travel, resulting in an ever increasing number of air passengers. The significant growth has resulted in unique and never...
Opportunities for Fixed Rail Service to Airports
With the increase in air passenger traffic and related ground access congestion many cities are examining potential links between regional transit systems and their airports. A working...
Baggage System Implementation at DIA
BAE Automated Systems is currently under contract to supply the complete, Integrated Automated Baggage Handling System (IABHS) for the New Denver International Airport. The system represents...
The Airport Traffic Control Tower for the New Denver International Airport
Developing a new airport traffic control tower involves many complexities of planning, engineering, and coordination. For the ATCT at the New Denver International Airport, these complexities...
Traffic Data Collection: What Really Needs to be Done?
The collection of 'existing' traffic data such as the 24-hour counts, turning movement counts, driveway volumes, and vehicle classification counts near the proposed project site becomes...
The Foundation for a Successful Traffic Impact Analysis
Both governmental agencies and private developers use the information developed in a traffic impact analysis (TIA).Traffic Impact Studies can be an important tool in efforts to maintain...
Analyzing Fast-Food Drive-Up Window Site Impacts
Peak-period queueing at a fast-food restaurant drive-up window was observed. The study found that queueing behavior equations based on random arrivals and service times overestimated the...
Comparison of Delay and ICU Analyses?Case Study
Traffic Management Initiative was a petition-based referendum that sought to limit traffic impacts of proposed or planned development through the use of more stringent transportation planning...
ICU?A Method of Analyzing Signalized Intersections
There is a need for decision makers, developers and the public to understand the potential traffic impacts of site development. Signalized intersection operations are a primary indicator...
Hotel-Casino Trip Generation Analysis Using GIS
Trip rates and models for developments such as resorts and major hotels are commonly based on a single explanatory factor or an activity unit such as floor area, number of employees, number...
Return to search