Demand Management Strategies for Providence Water Supply Board
The Providence water supply is the largest in Rhode Island, and the demands placed upon it continue to increase with the growth of the area as other systems turn to it as a preferred source...
Computer Support for Water Quality Management in San Diego Bay
At present, a variety of computer based systems and techniques, including mathematical models, data bases, information management schemes, statistical analysis packages, and graphical...
Computer-Aided Support for Water Quality Modeling of the Russian River
A computer-aided support system for operation of the QUAL2E-UNCAS modeling packaged has been developed for modeling of the Russian River, California. The system has been created under...
A Decision Support System for Water Quality Modeling
A prototype Decision Support System (DSS) has been developed to evaluate the environmental and economic consequences of alternative farming practices. This system was developed to help...
A GIS Based Synthetic Watershed Sediment Routing Model
For most watersheds, extensive water quality data are not available. Land use, topographic, edaphic and meteorological information is generally available; but without extensive water quality...
Estimating Urban and Suburban Sewage Flows with Assistance of GIS Technology
The Massachusetts Water Resource Authority (MWRA), an agency created by the Massachusetts legislature to provide wholesale water and sewer services to the metropolitan Boston areea, is...
Groundwater Recovery Program for Southern California
Under its new Groundwater Recovery Program (GRP), The Metropolitan Water District of Southern California will improve regional water supply reliability by providing financial assistance...
Development of the San Fernando Basin Groundwater Flow Model
This paper describes the development and calibration of the San Fernando Basin (SFB) groundwater flow model. The SFB is the largest groundwater basin in the Upper Los Angeles River Area...
Hydrologic Investigation of the April, 1983 Flooding in New Orleans, Louisiana
During the rainstorm of April 6-7, 1983, a shell ramp was constructed over State Highway 406, closing the relatively shallow depression formed by the roadway passing over the levee which...
Assessment of Derived Flood Frequency Distributions
Derived flood frequency distributions based on the geomorphologic IUH are evaluated in this work. Two existing approaches, the methods of Hebson and Wood (1982) and Diaz-Granados et al....
Critical Public Issues for Well Head Protection
New Jersey adopted in 1991 a Well Head Protection Program Plan to provide added safeguards to water supply wells. Through extensive public participation efforts the Department of Environmental...
Interfacing with the Public on Water-Related Issues?What TVA is Doing
Management of the water resources of the Tennessee River Basin has been a primary responsibility of the Tennessee Valley Authority (TVA) since its creation almost 60 years ago. In the...
Extended Experience with a Short-Term Hydropower Scheduling Model in New England
The New England Power Exchange (NEPEX) is responsible for the central dispatch of power throughout New England. To assure the maximum benefits of power pooling, the electric facilities...
Planning and Operation of a Multi-Reservoir Water Distribution System
A water supply distribution system planning model (DSPM) is developed using a directed graph algorithm as its pre- and post-processors and a linear programming (LP) procedure as an `intelligent'...
The 1991 Revolution in Water Management
A revolution in water management took place in California in 1991, the fifth consecutive year of drought. Deliveries from California's major water projects in 1991 were reduced 70 to 100...
Alternative Methods of Drainage Management in San Joaquin Valley, California
The subsurface drainage and drainage-related problems in the San Joaquin Valley cost millions of dollars to the State and local economy every year. A number of actions have been proposed...
Engineering Aspects of Wetland Design
Successful wetland enhancement, restoration, or creation projects require integration of desired wetland functions, local hydrologic and soil conditions, and biological requirements into...
Habitat Simulation in United States, Britain, and France
The need to identify an instream flow requirement for water resources management exists in a number of countries. The use of habitat simulation in the United States, Great Britain, and...
Are High and Low Flow Habitat Values Really the Same?
The Instream Flow Incremental Methodology calculates physical habitat as a weighted sum. Suitability of use information for each modeled species and life stage are used to weight each...
The Changing Alliance Between Navigational and Environmental Interests in the ACF Basin
Structural modifications imposed on the Apalachi-cola River for navigation, their environmental impacts and government actions to address these impacts are reviewed. Past structural modifications...
Return to search