Mitigation Features for Marinas
The John Wayne Marina was permitted for construction only after certain design features were altered to accommodate major biological and water quality concerns. The moorage basin was relocated...
Innovations in Dredged Material Disposal in Puget Sound
This study, known as the Puget Sound Dredged Disposal Analysis (PSDDA), is building on a strong history of federal/state cooperation within Washington which is unique in the United States....
Economical Solutions for Dredged Material Disposal
During the 1970's, the State of Wisconsin expressed concern about contamination of dredged materials and the deposition of pollutants into Wisconsin's Great Lakes...
An Innovative Solution to the Difficult Coastal Zone Management Problem of Dredge Material Disposal
The New York Power Authority is constructing a 300 km predominantly double circuit 345kV transmission facility through southeastern New York State. A key element in this project is the...
Aquatic Dredged Material Disposal in New England
The Disposal Area Monitoring System (DAMOS) is a large multi-disciplinary environmental monitoring program instituted by the New England Division (NED) of the U. S. Army Corps of Engineers...
Use of Sediment Bulk Chemistry Data for Dredged Disposal Management in Puget Sound
Although no fully scientific approach for setting and interpreting sediment chemical levels is currently available, an effects-based approach for using bulk chemistry data was evaluated...
Methods for Developong a Management Plan for a Small Tidal Inlet: Mecox Inlet, Long Island, New York
Few management studies have examined small ephemeral tidal inlets. The magnitude of short-term shoreline changes associated with some ephemeral inlets makes desirable the development of...
Oil Pollution in Suexz Gulf of the Red Sea
The population along the Red Sea coast is small, but this sea is now one of the most important areas in the world, for it is the route for ships using the Suez Canal. Many vessels transit...
Beach Restoration at Malaga Urban Area: Pedregalejo Case Study
The existence of a beach is a primary factor for the development of the adjacent urban areas. The present paper deals with the restoration project of Pedregalejo Beach (Malaga-Spain) and...
Ion Transfer by Diffusion Through Clayey Barriers
The practical aspects of pollutant migration by diffusion through clayey barriers is presented. The discussion is generally restricted to soils of pH approximately equals 8 which contain...
Plastic Concrete Cutoff Walls
The studies revealed that plastic concrete can be prepared having a coefficient of hydraulic conductivity that is less than 1 multiplied by 10** minus **7 cm/sec. The shear strength of...
Quality Control Testing for a Sand-Bentonite Liner
This paper presents the results of the quality control testing performed during the construction of a sand-bentonite liner for a sanitary landfill site in Central Florida. The available...
Acceptance Sampling for Clay Liner Design
The assurance of the quality of constructed clay liners has been a problem for geotechnical engineers. Compliance with minimum standards is necessary to ensure the liner performance capability....
Evaluation of Compacted Inert Paper Solids as a Cover Material
The following paper presents the results of a laboratory test program which focused on compacted sludges or inert paper solids (IPS) as recommended cover (cap) material over existing IPS...
The Use of Cone Penetration Testing for Evaluation of Waste Disposal Alternatives
Geotechnical information derived from cone penetration testing (CPT) has been found to give increased accuracy in the siting of waste disposal facilities and in the design of remedial...
Permeability of Compacted Clay Liners in Laboratory Scale Models
Experiments conducted in flexible wall permeameters have shown that the permeability of a soil sample is dependent on the size of the specimen tested. The permeability was found to decrease...
Geotechnical Properties and Landfill Disposal of FGD Sludge
Extensive test data from more than a decade of research are compiled on the geotechnical engineering properties of flue gas desulfurization (FGD) sludges with emphasis on double alkali...
Quality Assurance Monitoring of a Large Clay Liner
The Keele Valley Landfill at Maple, Ontario, consists of a 99 ha (245 acre) facility to serve the Metropolitan Toronto area. The landfill is located in a former sand and gravel pit, with...
Shallow Ocean Disposal of Contaminated Dredge Material
The contaminated dredged materials from harbors and waterways along heavily populated coastal areas such as Connecticut must often be disposed at shallow ocean sites. To isolate the contaminants...
Bentonite Matting in Composite Lining Systems
The 1984 Hazardous and Solid Waste Amendments to RCRA mandated that double lining systems utilizing synthetic membrane liners be required for hazardous waste landfills. Recognizing the...