Fish Protection at Water Intakes Using a New Signal Development Process and Sound System
American Electric Power Company, Inc., is exploring the feasibility of using a patented signal development process and sound system to guide aquatic animals with underwater sound. Sounds...

Atlantic Salmon Smolt Movement and Behavior at Vernon Hydroelectric Station
Behavior of emigrating Atlantic salmon smolts (Salmo salar) was studied at New England Power Company's (NEP) Vernon Hydroelectric Station located on the Connecticut River,...

Where's the Competition?: The Real Threats to Project Relicensing
The real potential competition in relicensing hydroelectric facilities is for use of the water and land resources currently dedicated to hydro power production. Relicensing applicants...

One Hydro Project?Many Regulatory Masters
A discussion of the dispersion of federal regulatory authority over the development of new hydro-power capacity is presented....

Legal Strategy in Dealing with Fish and Wildlife Resource Agencies
This paper is designed to provide a strategy for negotiating with Resource Agencies during the consultation and the 10(j) process. The strategy discussed herein can be reduced to three,...

Harrisburg Hydroelectric Project?Water Quality Issues
The Harrisburg Hydroelectric Project is a proposed 34.4 MW hydroelectric facility on the Susquehanna River near Harrisburg, Pennsylvania. The project will consist of a 16.5 ft high gated...

Development of Small Hydro in Ontario
Ontario is Canada's most populous Province with approximately 10 million residents, representing 40 per cent of the country's population. The electricity needs...

Reviewing the Role of Hydropower in TVA Reservoir Operations
The Tennessee Valley Authority (TVA) has reviewed the long term operating priorities for its reservoir system to determine the appropriate role of water quality and recreation as compared...

Low Flow Impact on Power in the Great Lakes Basin
Approximately 94,400 mW of installed capacity in the Great Lakes Basin could be adversely affected by low levels/flows induced by drought or climatic warming. Methods for evaluating the...

The Mt. Hope Waterpower Project
The Mt. Hope Waterpower Project is a 2000 megawatt, underground pumped-storage hydroelectric power project located on the site of an inactive iron mine in the township of Rockaway, New...

Benefits and Applications of Modular Hydroelectric Pumped Storage
Hydroelectric pumped storage is the only proven and most efficient technology available for energy storage. It is used by utilities to provide peak and intermediate power and to optimize...

More Power to the Allegheny?Design of the Allegheny 8 & 9 Hydroelectric Stations
The 13 MW Allegheny 8 Hydroelectric Station and the 17 MW Allegheny 9 Hydroelectric Station are located on the Allegheny River in the Commonwealth of Pennsylvania. The generating facilities...

Lake Siskiyou Power Project
The Lake Siskiyou Power Project was constructed at the foot of the existing Box Canyon Dam on the Sacramento River in Northern California. Major project features included the construction...

In-Mine Hydroelectric Power Generating Station
Mines in the world are continually descending to greater depths in the search of mineral deposits. Water and energy usage are crucial to expansion. To help deal with this problem, Freeport...

Technology Transfer in the Bureau of Reclamation
In addition to its traditional methods of transferring technology through reports and manuals and participation in professional and technical societies, the Bureau of Reclamation has initiated...

Small Hydro Site Ranking, Cost Methodology and Program
The user-friendly micro-computer program SHYDRO for costing small hydro has been prepared for the government of Canada and is available in the public domain. SHYDRO was initially applied...

AgriMet/Hydromet?Satellite Telemetry Meeting Water Management Challenges in the Pacific Northwest
In the hydropower-rich Pacific Northwest (approximately 70% of total regional load served), water resource agencies such as the U.S. Bureau of Reclamation (Reclamation) and the Bonneville...

Decision Rules for Reservoir Releases
One of the problems faced with computer modeling of a multi-reservoir, hydro-power system is making decisions on how releases will be made. Reservoirs many times have multiple demands...

The Wisconsin River System Operations Model: WIRSOM
The passage of the Electric Consumers Protection Act of 1986 requires the Federal Energy Regulatory Commission to give equal consideration to non-power as well as power values in hydroelectric...

Deflector Synchronizing and Governing
This paper is a survey of deflector control speed govern impulse turbines for synchronization to a grid, and for isolated operation. There are several advantages to deflector control versus...

 

 

 

 

Return to search