Lessons from Hurricane Hugo: Recommendations for Marina Operation and Design
Hurricanes are not new to South Carolina, but with the recent development of the coast, many new and unseasoned boaters have located in the area. Since Hurricane Hazel in 1954, South Carolina...

Marina Parking Study
This marina parking study establishes a rationale for determining parking demand at marinas on the north shore of Long Island Sound in Connecticut and New York. The study was performed...

Loma Prieta Earthquake?Emergency Response and Restoration: Water and Sewerage Lifelines
Water and Sewerage systems performed very well with a few exceptions in the Loma Prieta earthquake. Pipeline damage occurred in unstable ground. Damage at treatment plants was due to sloshing...

California Department of Transportation Seismic Retrofit Program: The Prioritization and Screening Process
Following the October 17, 1989 Loma Prieta Earthquake, the California Department of Transportation was designated as the lead agency to seismically retrofit all 23000+ public owned bridges...

Performance of Liquid Storage Tanks during the 1989 Loma Prieta Earthquake
Utilities and industrial facilities in the strong shaking area of the 1989 Loma Prieta earthquake include a large inventory of tanks of all types. The earthquake induced a few incidents...

Pavement Design for the New Denver International Airport
Denver International Airport is the first new major U.S. airport in twenty years. Primary airfield elements in Phase I development include 5-12,000 foot runways and 1-16,000 foot runway,...

DFW Concrete Block Pavement Taxiway Construction
The first concrete block pavement constructed on an airport in the United States was constructed at Dallas/Fort Worth International Airport during 1990. The use of concrete blocks on three...

Recycling Bituminous Runway Pavement into Aggregate Base Course
The paper discusses the development of recycling existing bituminous runway pavement by pulverizing into aggregate base course. To best explain the design, construction procedures and...

Performance of Airport PCC Pavements During Spring Thaw Periods
The portland cement concrete (PCC) pavements at two Wisconsin airports, Central Wisconsin Airport in Mosinee, and Outagamie County Airport in Appleton, were monitored during spring thaw...

DFW Pavement Management System Implementation
Dallas/Fort Worth International Airport is implementing a comprehensive pavement management program to assist them in identifying and prioritizing maintenance, rehabilitation and reconstruction...

Lifeline Earthquake Engineering
This proceedings, Lifeline Earthquake Engineering, contains papers presented at the Third U.S. Conference in Lifeline Earthquake Engineering...

Seismic Loss Estimates for a Hypothetical Water System
A Demonstration Project
This committee report, Seismic Loss Estimates for a Hypothetical Water System demonstrates how earthquake loss estimates can be developed for...

Waste to Energy? The Burning Question
For all their bad press, waste-to-energy plants actually provide a one-two environmental punch�they reduce garbage volume and provide alternative energy. But increasingly, state and local...

Slow Sand Filtration
This report, Slow Sand Filtration, was prepared by the Task Committee on Slow Sand Filtration of the Water Supply Committee of the Environmental...

Seattle's Good Neighbor Policy
The West Point wastewater treatment plant in Seattle sits on a spit of land jutting into Puget Sound. Close by is Discovery Park, a haven for nature lovers, located on a bluff above the...

On the Reliability of Offshore Platforms Against Random Sea Waves and Earthquake Motions
Dynamic response of offshore structures to random sea waves and strong earthquake motions is investigated. The wave-structure interaction is represented using the generalized Morison equation...

Seismic Hazard Estimation in the Eastern U.S.
Probable seismic hazard is generally estimated considering five elements: 1) seismicity; 2) source radiation; 3) wave propagation (attenuation); 4) site response; and 5) ground failure....

Seismic Ground Motion and Attenuation Relationships
A key element in the assessment of seismic hazard is the estimation of how energy from a given earthquake is affected by crustal structure along the propagation path. There are recognized...

Development of Seismic Hazards Data Base
A seismic hazards data base has been developed as a research tool for the engineering and seismology communities. The data base, which is still growing, currently contains information...

Simple Damage Predictors for Large-Scale Seismic Risk Mapping
Although it is now recognized that there is a risk of moderate seismic activity in the Eastern United States, many existing buildings were not designed for earthquake forces. To evaluate...

 

 

 

 

Return to search