Bartlett Dam Fuseplug Auxiliary Spillway
Bartlett Dam is located approximately 77 km northeast of Phoenix, Arizona on the Verde River. The Bureau of Reclamation (Reclamation) has determined that the structure is not capable of...
Current Legal Issues in Sedimentation
This paper represents the updating of Chapter 7 for Manual 54. There has been considerable change in legal rulings and precedent law since the first edition of Manual 54. Many of these...
Multi-Disciplinary Strategies for Flood-Plain Restoration at the River Rhine
Within the scope of a multi-disciplinary concept, aims and measures of ecological and water resources management at the river Rhine in Nordrhein-Westfalen (Germany) are analyzed. Especially,...
Reclamation's Design Process of Early Warning Systems for Dam Safety
This paper discusses the Bureau of Reclamation's process for designing the detection and decision making components of an Early Warning System (EWS) for dams with hydrologic deficiencies....
Yolo Bypass Wetlands?Impact Investigation
Approximately 20 square kilometers of wetland facilities are proposed to be installed within the Yolo Bypass of the Sacramento River Flood Control Project. A hydraulic impact investigation...
Bridge Abutment Scour in a Floodplain
Recent bridge failures due to pier and abutment scour have reinforced the need for better methods of scour prediction. This paper addresses the problem of prediction of clear-water scour...
Effect of Grain Size on Sediment Transport Calculations
The U.S. Army Corps of Engineers is currently developing a `Hydraulic Design Package for Flood Control Channels' (SAM). SAM is capable of computing sediment rating curves and stable channel...
Preliminary Studies of Pressure Flow Scour
Bridges that become inundated during floods have slightly pressurized flow that impacts bridge piers and creates an aggravated scour condition. Results of two preliminary laboratory studies...
Economics of Floods, Scour, and Bridge Failures
Hydraulic events occur more often and account for more losses than any other natural disaster. The damage inflicted on our nation's highway facilities during these events not only results...
Scour Around Bridge Piers in Oklahoma Streams in 1986
Historically, Oklahoma has received many severe rainfall and flooding events due to hurricanes hitting the coast of Florida and moving to the Gulf Coast area. One such event occurred during...
Emergency Protection, San Luis Rey River Aqueducts
A calibrated hydraulic computer model (FLUVIAL-12) was used to predict flood damage potential at the two San Diego Aqueduct river crossings in northern San Diego County. Model results...
Design and Performance of Emergency Spillway Channel Erosion Protection?Grenada Lake Dam, Grenada, Mississippi
Grenada Lake Dam located on the Yalobusha River in northeast Mississippi is part of the Mississippi River and Tributaries comprehensive plan for flood control. The 13,000-ft-long earthfill-type...
The Study of Riprap as Scour Protection for Bridge Abutments
The purpose of this paper is to provide design guidelines for riprap protection of spill-through and vertical-wall abutments situated in floodplains. With the benefit of laboratory experiments,...
Multi Objective Detention Outlet Control Structure
Increasing numbers of stormwater management ponds are being included in the design of urban and rural drainage projects. This is in part due to the environmental outcry to clean up our...
Low-Flow Habitat in Flood Control Channels
A critical phase in the life cycle of many riverine species in flood control channels is during low-flow periods when the quantity and quality of available habitat diminishes. However,...
Numerical Modeling of Unsteady Compound Channel Flow
The unsteady open channel flow equations describing conservation of mass and momentum (St. Venant equations) are integrated numerically to determine the depth of flow and the rate of discharge...
Use of Floodplain PCB Concentrations to Calibrate a River Hydraulics Model
A river floodplain was found to contain measurable quantities of polychlorinated biphenyls (PCBs), presumably deposited during historic flood events. A hydraulic model (HEC-2) was used...
Debris Flows in Grand Canyon National Park, Arizona: Magnitude, Frequency and Effects on the Colorado River
Debris flows are recurrent sediment-transport processes in 525 tributaries of the Colorado River in Grand Canyon. Arizona. Initiated by slope failures in bedrock and (or) colluvium during...
Determination of Hydraulic Roughness for Concrete-Lined, Supercritical Channels
A channel verification program has been initiated by the US Army Engineer District, Los Angeles to determine the hydraulic roughness of flow in a concrete channel. Specifically, this study...
Applicability of Two Simplified Flood Routing Methods: Level-Pool and Muskingum-Cunge
Simplified flood routing models for unsteady flow simulation in reservoirs and rivers have advantages of relatively small computing requirements when compared to dynamic routing models...
Return to search