The Design and Operating Experience of a Multiplexer Application in Conventional Hydro Powerhouse Control
The design of the Bonneville Second Powerhouse control system presented an opportunity to replace conventional cables with a multiplexer system that would provide a two-way data communication...
Capabilities of Automated Control System Employing Advanced Programmable Controllers
This paper details Voith Hydro's range of experience in the use of Programmable Logic Controllers (P. L. C. 's) in the automation of new hydro electric sites....
Integrated Automatic Hydroelectric Plant Control
The increased acceptance and employment of microcomputers to control specific functions in small hydroelectric plants has led to computerized integrated total control of hydropower generation....
Voltage Versus Var/Power Factor Regulation on Hydro Generators
When paralleled to the utility bus, synchronous generators can be controlled using either terminal voltage or var/power factor regulation. Selection is dependent upon the size of the generator...
Large Low-Speed Generators with Skewed Supporting Parts
During the past decade, the demand for hydro-generators has been for increasingly high ratings, up to the present maximum of about 800 MVA. These low-speed machines have rotor diameters...
Control and Tests of Tims Ford Induction Generator
This paper will discuss the electrical control scheme and commissioning tests developed for a small induction generator installed by the Tennessee Valley Authority (TVA) at its Tims Ford...
Electrical Equipment for Pumped Storage Plants
Selection of generator/motors and other electrical equipment for pumped storage plants requires consideration significantly different than for conventional hydro plants. This is particularly...
What is Wrong with our Hydro Generators?
A number of studies have already been presented on the refurbishment and modernization of hydro facilities and also the design and upgrading of the generators. This paper will partly deal...
McNary Powerhouse Generating Unit 14 Stator Core and Winding Replacement
The powerhouse contains 14 main generating Kaplan-blade units, each rated at 73,684 kVA at 0. 95 power factor. In early 1985 the decision to rewind and uprate Unit 14 was being finalized....
Accelerated Life Testing of Generator Coils
This paper presents a step-by-step procedure for doing a 400 hour, 60 Hz, 90 degree C accelerated life test on generator coils. Test procedure is as follows: 1. Initial coil examination...
The Stanley Canyon Conduit Hydroelectric Project
The Stanley Canyon Hydroelectric Project is an excellent example of the maximum use of a natural resource. The project is a combined water supply and hydroelectric facility which received...
Small Hydrodevelopment: An Owners Perspective?El Vado, New Mexico Hydroelectric Project
The construction of the El Vado Hydroelectric Project posed several unique problems. The joint ownership of the dam between a Federal and State agency was unique to the region. The proposal...
Our Municipal Water System Has Power
Hydroelectric potential exists in the Boulder, Colorado municipal water system. Excess pressure is developed in the water system because the water originates in the Rocky Mountains, west...
Hydropower Goes Downtown
Beneath a busy street in Southern California seems an unlikely location for a small hydroelectric generating plant. However, located just below El Segundo Boulevard in the town of El Segundo...
Design of Seepage Control Systems for RCC Dams
As the reservoirs of the first generation of roller compacted concrete (RCC) dams have been filled, several have exhibited significant amounts of seepage, a fact that has been of concern...
Vibration Analysis Using a Parallel Lanczos Method
A parallel eigenvalue solution algorithm, based on the Lanczos method, has been developed, implemented on a Flexible Computer FLEX/32 multi-processor, and applied to an example structural...
Concurrent Nullspace Methods for Multibody Systems
This paper presents a new concurrent multiprocessing algorithm for simulating the dynamics of constrained multibody systems. The systems considered are quite general in nature; they may...
Structural Analysis and Parallel Computers
This paper discusses the implementation of a parallel program that performs a two dimensional rigid frame analysis on a NCUBE/7 hypercube multicomputer. The program was written in C and...
A Finite Element System for the CDC CYBER 205
This paper summarizes some of the special considerations required for finite element system development on the CDC CYBER 205. A means of constructing an efficient database is presented....
Finite Strip Method in a Parallel Computing Environment
The finite strip method has been used to model many systems in structural mechanics. The orthogonality of appropriately selected shape functions allows a continuous system to be effectively...
Return to search