Design of an Alluvial Channel Relocation in an Urban Environment
The relocation of a three-mile (4.8 km) reach of the Salt River channel in metropolitan Phoenix, Arizona is reviewed. The methods used for hydraulic analysis of this dynamic alluvial channel...

Stable and Environmental Channel Design
The Wildcat and San Pablo Creeks Flood Control Project is located in Richmond, California. Both streams flow through a highly urbanized area, periodically overflowing their banks and causing...

Computer Aided Hydraulic Design of Open Channels
Over a 10 year period, the computer program, WASURO, was developed by the U.S. Army Corps of Engineers District, Los Angeles (LAD), which utilized many of the criteria of the previously...

Power Formula for Open-Channel Flow Resistance
This paper evaluates various power formulas for flow resistance in open channels. Unlike the logarithmic resistance equation that can be theoretically derived either from Prandtl's...

A Lawyer's View of Engineers' Responsibility
When presented with a case involving damaged property, a lawyer typically will seek to determine the point of the failure and then work backwards in an effort to analyze each of the factors...

Southwestern Drainage Litigation
In this paper, three technical sources of drainage litigation are examined. First, in the overall sparsely but locally densely populated Southwest, there is a severe lack of precipitation...

Calibration of Water-Velocity Meters
The U.S. Geological Survey, Department of the Interior, as part of its responsibility to appraise the quantity of water resources in the United States, maintains facilities for the calibration...

Closed-Loop Control for Hydraulic Laboratory Operation
The implementation of Closed-Loop Feedback Control in the Bureau of Reclamation's Hydraulic Laboratory flow delivery system has provided an important new modeling tool for...

Applications of GSTARS Model
GSTARS is a Generalized Stream Tube model for Alluvial River Simulation. Depending on an engineer's need, GSTARS can be used as a fixed boundary as well as a movable boundary...

Geotechnical and Hydraulic Stability Numbers for Channel Rehabilitation: Part I, the Approach
A model of incised channel evolution was developed to integrate the geotechnical and hydraulic factors that are involved in channel rehabilitation. Bank stability is attained when the...

Geotechnical and Hydraulic Stability Numbers for Channel Rehabilitation: Part II, Application
Stability numbers for bank stability (Ng) and bed stability (Nh) have been developed. Optimum placement of...

Design Depths and Velocities on Alluvial Fans
Under Federal Emergency Management Agency (FEMA) guidelines, flood depths and velocities on alluvial fans are determined by considering the probability of a given point on the alluvial...

Design and Evaluation of Storm Water Detention Facilities Using a Design Storm and Probable Maximum Storm
When designing a storm water detention facility, both a design storm (DS) and a probable maximum storm (PMS) should be considered. The DS is used to design the facility. The PMS is used...

An Inline Retarding Basin
This paper discusses the idea of retarding flows within existing right-of-way in a linear basin. This concept is based on longitudinally dividing the right-of-way into two sections. The...

Features of Flow in Slurry-Thickening Ponds
The study reported was undertaken to investigate the physical processes which come into play in settling-pond slurry thickeners and causes their behavior to deviate from those included...

Probabilistic Approach to Maintenance Scheduling
Maintenance has the purpose of prolonging the working life of equipment and of sustaining expected levels of performance and reliability. If equipment deterioration is construed as a probabilistic...

Analysis of Progressive Development on Alluvial Fans
Flow on alluvial fans is considered to be somewhat unpredictable and complex, experiencing high velocities, avulsions, erosion, and deposition causing a dynamic topography with flooding...

Hydraulic Design for La Quinta Stormwater Project
An upstream detention basin was designed to trap debris and attenuate flows into Bear Creek Channel. The high velocity supercritical flow made a one side bank protection design for the...

Hydraulic Study for the Construction of Artificial Islands in Peoria Lake, Illinois
Long-term sediment accumulation in the lake reduced the average depth of the lake from 8 feet in 1903 to 2.6 feet in 1985, which resulted in the deterioration of aquatic habitats and recreational...

Kissimmee River: Engineering Approaches for Restoration
The Kissimmee River, located in central Florida, was channelized for flood control during the 1960s. Movements by environmental interest groups have produced strong sentiment to restore...

 

 

 

 

Return to search