Expert Systems for Civil Engineers
Education
While the technology of expert systems can provide engineers with another approach to the development of computable models for civil engineering problems, it is not clear what a course...
The Pacific Northwest Rivers Study: Development of a Rivers Inventory and Analysis System
To minimize conflicts between hydropower development and resource conservation, the Bonneville Power Administration and the Northwest Power Planning Council initiated the Pacific Northwest...
Pumped-Storage: An Analysis of Optimal Capacity
This paper presents a systems analysis procedure to evaluate planning alternatives for pumped-storage operated in an existing power system. This procedure can be used by planners and engineers...
Selection of Jim Falls Turbine Generators
The selection of the unit configuration for the Northern States Power Company's Jim Falls Hydro Redevelopment Project was based on an extensive evaluation of various turbine...
Case Study on the Development of a Hydro License Compliance Monitoring System
As the holder of 29 Federal Energy Regulatory Commission (FERC) licenses, Pacific Gas and Electric Company (PGandE) has an obvious need to monitor and document compliance with the numerous...
Development of Hydropower Projects on National Forest System Land
The United States Department of Agriculture Forest Service has a major role in hydroelectric developments on National Forest System land. It is charged with managing the land for multiple...
Reservoir Releases Improvements?Requiem for Integrating Pollution Control and Resource Management Programs?
To better define the interrelationships between economic growth and development, pollution control, and water resource management, TVA conducted two studies that examined how reservoir...
Systems Analysis for Fisheries Protection and Mitigation at Corps of Engineers Columbia River Dams
Pacific Northwest anadromous salmon and steelhead that migrate to and from the ocean are greatly affected by the numerous Columbia and Snake River dams they have to pass, first downstream...
Power System Study to Determine Hydro Benefits
This paper discusses evaluation methodologies used by Stone & Webster to determine the power benefits for six potential hydropower projects at existing U. S. Army Corps of Engineers...
Reliable Operation of Hydro-Thermal Power Systems
The demonstrated model allows planners to account for both operating and shortage costs, subject to a constraint on the system failure rate. In addition, the optimal long-term operation...
Pumped Storage and Power System Operations
The 2100 megawatt Bath County pumped storage power station began commercial operation in December 1985 as a jointly-owned project of Virginia Electric and Power Company (Virginia Power)...
Operational Flexibility?A Precious Commodity
This discussion is about Operational Flexibility, as it applies to the generating resources of a large electricity system. The author discusses the situation at Ontario Hydro, operationally...
Determination of Values of Project Storage for Hydropower Scheduling
The Columbia River is characterized by multiple and sometimes conflicting uses, and its basin extends over many political jurisdictions. To balance pluralistic needs and authorities with...
Marketing Power in the Pacific Northwest
The marketing of power in the Pacific Northwest is a process intimately tied to the management of the Columbia River system. This paper describes the characteristics of the river and transmission...
Hydrologic Dispatch Model for a Hydropower System
A hydrologic dispatch model was developed for an 11 plant, six reservoir hydroelectric system. The model incorporates load forecasting, system dispatching strategy, and database management...
Optimal Operation of the Savannah River System
This paper presents an application of a stochastic control method to the real time operation of the Savannah river system which includes three reservoirs and is expected to meet energy...
The Role of Headwater Benefits in Hydropower Planning
Headwater benefits are the power benefits that accure to owners of downstream hydroelectric plants as a result of the operation of headwater improvements. The retention of water in upstream...
Dam Safety Emergency Action Plans?A TVA-State Responsibility
The Federal Guidelines for Dam Safety requires each dam owner to prepare and maintain emergency action plans (EAP) for each of structure. These plans are necessary (1) to identify problems...
Appropriate Design and Construction of Conduits for Small and Mini Hydropower
The success of smaller hydro schemes often lies in identifying feasible and economic waterway systems to develop relatively high heads between low intake weir and powerstation. This paper...
Osoyoos Lake Control Structure
The new Osoyoos Lake Control Structure has been built on the Okanogan River at Oroville, Wa. The site is about 2 miles downstream from the outlet of Osoyoos Lake, and about 9 miles south...