Development of Standards for Slipform & Jumpform Works
Review of past work indicates substantial effort has been made to publish construction standards and guidelines for slipforms but published material pertaining to jumpforms is scarce....

Temporary Structures for Protection and Access
Temporary Structures in Construction Projects (TSC) are utilized for three (3) purposes A. Support (of the structure being built or adjacent structures or utilities) B. Protection (of...

Fall Protection & Debris Containment During Construction
The purpose of this paper is to review the current practices in the United States for both fall protection and debris protection during high rise construction. A performance comparison...

Temporary Lateral Support System for Historic Building Facades in Boston
This paper describes a system of vertically cantilevered structural steel trusses, designed by the author, that provided temporary lateral support for a group of five and six story, 120...

Performance of a Prestressed Rigid Frame During Removal of Column 6W from I93 in Boston, Massachusetts
The first phase of the suppression of Boston's Central Artery included the Early Viaduct Construction in the Central Artery North Area. This project required that Column 6W...

Permanent Structure as Part of the Underpinning System for Boston's Central Artery
The Central Artery, a major six lane structural steel viaduct, has been one of Boston's most significant roadways over the past three decades. Increasing congestion, accidents,...

Modular-Prestressed Shoring System for Demolition
Two case histories are used to present the development and performance of a modular prestressed vertical shoring system to control deflections of existing structures during the demolition...

Design and Planning of Structural Steel Roll-In
Innovative construction methods were required to erect structural steel inside a 170 foot long box truss over a railroad. The contractor engineered and executed a unique system to roll...

Composite Twin Tub Bridge Erection Intersection of Interstate I-84 and I-94 in Hartford, Connecticut
Curved bridge erection requires detailed preparation by the contractor, plus a sharing of responsibility and liability between the owner, designer of the new structure and the contractor....

Computer Assisted Design and Construction
This paper presents a comprehensive package for conducting structural analysis, design, and project management on microcomputers. Several examples are presented to illustrate the usefulness...

The Virtual Design Team: An Object-Oriented Model of Information Sharing in Project Design Teams
The Virtual Design Team (VDT) is an object-oriented, discrete event simulation of a multidisciplinary design team in action. The VDT models a design task as a network of design and design...

Construction Inspection in South Carolina
The paper will discuss the experience of the South Carolina Department of Transportation in the use of consulting engineering firms on bridge construction projects. A review of the current...

Central Artery (I-93)/Tunnel (I-90) Project
This paper is intended to provide an overview of the Boston Central Artery/Tunnel Project (CA/T) Project; a $4.9 billion USD interstate highway constructed underground through a densely...

Geotechnical and Construction Aspects of the Immersed Tube Tunnel in Boston Harbor
An immersed tube tunnel (ITT) approximately 3,850 feet in length will be constructed as a part of the Central Artery/Tunnel Interstate Highway Project located in Boston, Massachusetts....

Seismic Design Issues for Immersed Tube Tunnels
This paper provides an overview of the issues and the state of the art techniques in the seismic design of immersed tube tunnels (ITT). Particular focus is given to the ITT presently planned...

Immersed Tube Tunnel, Boston, Massachusetts
A four-lane Immersed Tube Tunnel is planned for the crossing of Boston Harbor from the City of Boston to the Logan Airport area in East Boston. The immersed tube consists of 12 sections...

Designing Plans for Constructability
The writer has obtained several years experience acting as construction engineer for roadway rehabilitation projects as a consulting engineer. In this capacity, it is necessary to provide...

Constructability?Washington State Highways
During the last decade, efforts were directed towards improving constructability of highway design at Washington State Department of Transportation (WSDOT). This paper briefly summarizes...

Time/Cost Bidding
This paper presents the details of a relatively new and innovative approach to determining the low bidder on highway construction contracts. In the cost and time method each bidder proposes...

State and Local Issues in Transportation of Hazardous Waste Materials
Towards a National Strategy
This proceedings contains papers presented at the specialty conference State and Local Issues in Transportation of Hazardous Materials: Towards a National Strategy held on May 14-16, 1990...

 

 

 

 

Return to search