Global Problems: Implementing Mission to Planet Earth
Serious global environmental problems are facing our generation on Earth. The decrease in ozone concentrations and the greenhouse effect have implications for all life forms on the planet....

Large Space Systems in Global Change Mitigation
Alternative courses of action are an important aspect of reacting to climate changes, including the greenhouse effect, and other environmental issues such as depletion of the ozone layer....

Conceptual Design for a Lunar-Base CELSS
Future human exploration is key to the United States National Space Policy goal of maintaining a world leadership position in space. In the past, spacecraft life support systems have used...

A Prototype Model for Human/Automation Trade-offs
Future space construction missions will involve both human and machine constructors. Selection of the optimum constructor mix requires a model of constructor capabilities and requirements....

Artificial Gravity Research Facility Options
On a long duration manned mission to Mars, the physiological changes caused by microgravity may be counteracted by artificial gravity. This paper evaluates several different classes of...

Partial Gravity: Human Impacts on Facility Design
Partial gravity affects the body differently than earth gravity and microgravity environments. The main difference from earth gravity is human locomotion; while the main difference from...

Columbus Generic Element Management Concept
The concept for largely autonomous onboard management of the ESA Columbus project elements relies on the automation of operational procedures. Reconfigurable items are commanded in sequence...

A Language Model for Space Construction Control
The optimal construction system for many space construction projects is a mixed construction ensemble. Such an ensemble consists of humans, robots with varying degrees of teleoperation...

New Technologies for Unmanned Space Exploration
There could be no better time than now for the development and implementation of new technologies such as V.L.S.I. and optoeraseable storage. Creative inventions from new mathematical...

A Design Process for Water Distribution Systems Including Optimization
Design of a water distribution system is a multi-level process from preliminary planning to final detailed sizing of components. Unfortunately as in many design problems, a final detailed...

Upgrading Hydraulic Infrastructure for Level One Redundancy
In the current paper a methodology is presented for upgrading any single source water distribution system in order to provide a level one system redundancy at a minimum cost. A level one...

Optimal Control Strategies for Water Distribution Systems
The overall operation problem becomes one of determining which pumps to run and when to run them so that electrical unit costs and electrical demand charges are minimized while at the...

A Methodology for Optimal Control of Pump Stations
Pumping water to utility customers is an expensive service which consumes large amounts of energy. Most approaches to date require simplifications and assumptions for the specific system...

Remote Infrared Thermal Sensing of Sewer Voids
The question addressed by this paper is how to detect unseen problem areas in sewer systems before they give way. At present, progressive sewer administrations may use crawl crews or television...

Soft Bottom Low Flow Channel?A New Approach
In 1987, the City of Boulder, Colorado requested assistance from the Urban Drainage and Flood Control District (District) to repair a problem of cattails growing in the low flow portion...

A Water Pricing Model for Lake Texana
Faced with water sales and recreation revenues insufficient to service the project debt, the Lavaca-Navidad River Authority (L-NRA), operators of Lake Texana, decided upon a novel approach...

Optimal Real-Time Operation of Te-Chi Reservoir
An optimization model for the 10-day operation of Te-Chi Reservoir in central Taiwan is developed. The inflow to the reservoir is forecasted by an ARX model with a Kalman Filter updating...

Estimating the Energy Rate Function for Hydro Power Production Optimization
Operations planning at Manitoba Hydro is aided by using the Energy Management and Maintenance Analysis (EMMA) computer program. EMMA is a Linear Programming (LP) based model with the objective...

A Travel Time Template for Water Body Field Surveys
A LOTUS 1-2-3 spreadsheet application has been developed to help plan water body surveys. The template calculates travel times between sampling stations and outputs a time schedule for...

Simulation of a Surface Water Allocation System
This paper outlines the water rights system in Texas and a newly developed computer simulation program for modeling this system. In addition, an overview of a river basin simulation using...

 

 

 

 

Return to search