Structural Engineering Lessons Learned From Hurricane Hugo
Hurricane Hugo purported to be 'The Storm of The Century' caused considerable property damage over a tremendously large area effecting nearly everyone and every...

Development of Long Beach Downtown Marina
This paper describes the planning and construction of the new Alamitos Bay Marina just offshore of Long Beach's downtown shoreline. From an engineering standpoint the construction...

Offshore Oil and Gas Support Facility Siting Study
It has been estimated that the Bodega Basin, which extends offshore of Sonoma County, contains four areas of high potential for oil production, with a total of up tp 195 million barrels...

Focus Towards Partnership?Saguenay Marine Park Joint Management Test Case
This paper presents the recent trends in parks' establishment in Canada. It focusses on the Saguenay Marine Park where Government of Canada and Government of Quebec have joined...

Bayswater Park Restoration?The Case for Offsite Mitigation
A long term parking lot redevelopment, including a 33 acre (0.13 km2) expansion on an undeveloped parcel of the John F. Kennedy (JFK) International...

Potential Benefits of Harvest Refugia in Channel Islands National Park and Channel Islands National Marine Sanctuary
Waters surrounding the California Channel Islands are managed for many diverse, and apparently conflicting, uses. Generally, activities are permitted that do not threaten long-term resource...

A Zoning Code Revision for Port Development?The Story of East Providence
The City of East Providence evaluated the effectiveness of the City's 30 year old zoning code and revised performance standards in the zoning text in light of possible marine...

Recreational Impacts on Coastal Habitats: Ventura County Fairgrounds, California
The doubling of California's population since 1960 has presented new challenges to the California Coastal Act's mandates to maximize public coastal access and...

The Role of Mitigation Funds in Mitigating Residual Impacts
Environmental Impact Reports/Statements (EIR/S) for four offshore oil and gas projects with onshore components in Santa Barbara county have identified potential impacts to coastal and...

Land-Use Issues Raised by Offshore Oil and Gas Development
While prudent development of offshore energy resources may provide benefit to the nation overall, it invokes several issues for local and regional planning. In particular, petroleum development...

Remedial Planning for the Former EXPO 86 Site
This paper describes the site characterization and remedial action planning effort that is being undertaken at the former EXPO 86 site in downtown Vancouver, B.C. The 200 acre site on...

Probabilistic Analysis of Modernization Options
Benefit-cost analysis is a standard procedure for reaching planning decisions. Cost overruns and benefit shortfalls are also common occurrences. One reason for the difficulty of predicting...

Renovation and Uprating of Seven Hydropower Plants in Java
The Indonesian Power Authority is planning to renovate and uprate seven hydropower stations in Java to expand plant life expectancy, ensure operating safety and reliability, and increase...

Evaluating the Dynamic Operating Benefits of Hydro Power Plants
In 1986, the Electric Power Research Institute asked Decision Focus to develop a new planning model to quantify the dynamic operating benefits of power technologies that offer operating...

Technology Transfer for Small Hydro
The wide range of different definitions of what constitutes a small hydroelectric power plants is discussed and the conclusion is drawn that this definition should be based more on the...

Challenges in the Design and Manufacture of Small Replacement Runners
The increasing trend within the hydro industry to achieve additional capacity and/or energy through runner replacement has brought with it new challenges for the turbine manufacturer....

Rehabilitation of the Historic Ocoee 1 Hydro Power Plant
The Ocoee 1 Hydro Plant is located on the Ocoee River 16 miles east of Cleveland, Tennessee. Built by the East Tennessee Power Company, it was placed in commercial operation in 1912. There...

On-Site Rehabilitation Capabilities for the Nineties
This paper will review recent technological advancements in on-site manufacturing and machining capabilities which have been developed for the proper installation of new hydro turbines....

Investigations on 3-D Flow Structures in Combined Systems of Groynes and Harbour Basins
The structure of the flow field in harbour basins shows significant three-dimensional (3-D) effects, e.g. variation of the direction of the horizontal velocity components with depth, existence...

McClure Park: A Multi-Purpose Off-Stream Storage Facility for Tulsa, Oklahoma
The City of Tulsa is in the process of implementing a flood control plan for the 61 square-mile (158 km2) Mingo Creek watershed. The federally-assisted...

 

 

 

 

Return to search