Roller Compacted Concrete IV
This engineering manual Roller-Compacted Concrete from the U.S. Army Corps of Engineers provides information and guidance on the use of roller-compacted...

Interpretive and Modelling Problems of Risk and Uncertainty in Bidding Techniques
This paper considers the implementation of policy, strategic and tactical bidding and the processes of devolution of the risk and uncertainty in a corporate management context....

Decision-Making Paradigm for Risk Assessment of Hazardous Wastes Using Fuzzy Sets
This paper summarizes the development of a risk assessment framework to provide risk-cost policy alternatives to prioritize remediation actions for hazardous wastes. The framework is a...

Development of an Expert System to Identify Hazardous Highway Spots
The paper describes the development of an expert system within a geographic information system to identify high-hazard spots in a highway network. The philosophy guiding expert system...

The Safety Advisor: An Interactive Object-Oriented Program for Assessing the Safeness of Roadway and Roadside Designs
This paper describes an object-oriented software tool for performing safety assessments of roadway designs. Safety assessments are used to estimate the effect of changes in roadway characteristics...

Computer Implementation of Fuzzy Reasoning in Tendering
There are a lot of risk factors need to be considered in tendering in the construction industry. Examples are a) The market conditions: the degree of competition, the prevailing and the...

Computer Analysis of Lateral Loading in Wood-Framed Structures
Building codes and design techniques associated with single-family housing need to incorporate advances in architecture and construction so that the traditional life-safety building codes...

Application of Fuzzy Logic in Civil Engineering in Japan
In various engineering fields, many applications of fuzzy logic have been attempted, some of which have been applied for practical use. In this paper, civil engineering applications of...

Wanapum Dam Embankment Settlement Study
This paper discusses the long term vertical movements of a zoned earth embankment. Vertical movement of the Wanapum Dam embankment has been monitored since its completion in 1964. The...

Analysis of the Juturnaiba Embankment Dam Built on an Organic Soft Clay
The Juturnaiba Dam, located in the northern part of Rio de Janeiro State, Brazil, has 1.2 km of its length built on an organic soft clay about four meters deep. The construction of the...

Performance of Nanhua Dam During Construction
The pore pressure response and settlement during the construction of Nanhua dam were studied by several methods, including Hilf's method, laboratory stress path simulation and numerical...

A Procedure for Predicting Seismic Deformation of Earth Structures
This paper presents an analysis procedure for predicting the earthquake induced displacements of earth structures. The procedure is an extension of the simple Newmark method from a single-degree-of-freedom...

Seismic Settlement of Shallow Footings on Sands
In this contribution, the progressive seismic settlement of shallow footings on cohesionless soils is calculated using a sliding block model. Beyond a critical horizontal acceleration,...

Federal Risk Management Policy: Where Are the Problems?
Federal risk management policy involves both risk assessment and risk management elements. Risk assessment consists of hazard identification, dose-response assessment, exposure assessment,...

Poorer Is Riskier: Opportunity for Change
With regard to water resources, it is appropriate to build upon two interacting themes of the late Aaron Wildavsky (1988). The first of Wildavsky's themes is the idea of resiliency. The...

Measuring the Benefits of Flood Risk Reduction
Property damages avoided, land price analysis, and contingent valuation were techniques used to estimate the economic benefits of flood risk reduction for residential land parcels in Roanoke,...

Uncertainty and Time Preference in Shore Protection
From a review of economic, psychologic, and geographic literature, three points of criticism of the economic model of choice are 1) when faced with losses, individuals tend not to be averse...

Bayes' Theorem and Quantitative Risk Assessment
This paper argues that for a quantitative risk analysis (QRA) to be useful for public and private decisionmaking, and for rallying the support necessary to implement those decisions, it...

Federal Risk Management Policy: Where Is the Federal Government Heading? Where Are the Problems?
The paper summarizes the first session of the conference which discussed the present state and problems of federal risk management policy. Topics discussed include efficacy of models on...

Behavioral, Social, and Institutional Aspects of Risk Analysis
The paper summarizes the third session of the conference which discussed four items that become pitfalls for decision makers when neglected. These are parameter uncertainties as distinct...

 

 

 

 