Effects of Dredging and Dredge Spoil Disposal on Fisheries Resources in the New York State Barge Canal
The New York State Department of Transportation initiated a study in the summer of 1982 in the New York State Barge (Erie) Canal in the vicinity of Rochester, N. Y. The purpose of the...

Capped In-Water Disposal of Contaminated Dredged Material
The Seattle District and the Corps of Engineers Waterways Experiment Station (WES), Vicksburg, Mississippi, are cooperating in a field demonstration study to evaluate the effectiveness...

Settling of Dredged Material Slurries
Most environmental engineers, accustomed to dealing with clarification of suspensions containing approximately 150 mg/1, find it difficult to comprehend dredged material slurries, in which...

Improved Techniques for Removal of Sediments Contaminated with Hazardous Materials
Realizing the need to improve the capabilities of response personnel in dealing with cleanup operations involving contaminated sediments, the U. S. Coast Guard and the U. S. Environmental...

Environmental Legislation Impact on the Port of New York and New Jersey
Environmental legislation since 1972 has resulted in an extensive evaluation of dredged material disposal alternatives for New York Harbor navigation projects. Consideration has been given...

The Corps' Environmental Effects of Dredging Programs
The major programs addressing environmental effects of dredging and disposal that have been or are being conducted by the Corps since 1973 are: Dredged Material Research Program, Dredging...

Fundamentals of Capping Contaminated Dredged Material
Contaminated dredged material disposed in subaqueous sites may be chemically and biologically isolated by covering or capping with a layer of clean material. The capping concept is simple;...

PCB Contaminated Sediments from Petit-de-Grat, Canada
In Canada, ocean disposal of dredged materials is regulated by the Ocean Dumping Control Act. Included within the schedules of regulated substances are organochlorine compounds, such as...

Confined Disposal Area for Port Hueneme Harbor, Calif.
The U. S. Army Corps of Engineers, Los Angeles District, is responsible for maintenance of harbors along the Coast of California from Morro Bay Harbor to San Diego Harbor. As part of this...

Alternative Upland Disposal Techniques for Dredged Material in Urban Areas
The project involves the dredging and disposal of 750,000 cubic yards of soft organic silts from a 32 mile long manmade Canal that tranverses through Central New Jersey and is known as...

Effects of Fines in Gravel Bed Streams Behavior
A model-gravel bed stream is studied in the laboratory. Flow visualization of bedload motion correlates with bursting phenomena near the bed. The bedload variation as a result of the addition...

Development of Response Plans for Toxic Spills
A plan is proposed for managing the response to a toxic spill into a river system and the minimization of its effects on water utilities, industry and the environment. As technical aids...

Numerical Simulation of the Bed Armoring Process
The stability of a river channel depends to a great extent on sediment characteristics. If the amount of sediment coming into a given reach for some reason becomes less than the river's...

Hydraulic Testing of a Large Make-Up Pipeline
A 37 mile pipeline which consists of sections of 114 inch, 96 inch and 66 inch pipes was constructed for delivering secondary sewage effluents for power plant makeup. During initial operations,...

Coping with High and Low Pressures of Transient Flow
Conditions exist in most long distance water pipelines, such that abnormal but inevitable occurrences will cause transient flow. Often the most crucial conditions for consideration by...

Hydraulic Analysis of Water Transmission Flowing Party Full
The hydraulic behavior of a transmission line that flows full along only part of its length is more difficult to analyze than a completely full line. Unsteady open-channel and closed-conduit...

Computer Aided Hydraulic Design of Pipelines
General purpose computer software packages are being used more frequently in the hydraulic design of pipeline systems. The areas where the use of such packages are advantageous over earlier...

Vacuum Assisted Pipelines Operation
In the process of upgrading the sewerage facilities for Lancaster, Pennsylvania, it was decided to combine two existing facilities into one new facility. This required the design of three...

Milwaukee Sewerage District Interplant Pipeline
The pipeline is intended to transfer solids between the Jones Island and South Shore treatment works a distance of approximately 12 miles (19. 3 km). The 4 conduit pipeline comprising...

Willow Creek Dam--To Be or Not To Be
In Heppner, Oregon, several alternatives for flood control were considered. A concrete gravity dam constructed using roller compaction methods was selected because of the greatly reduced...

 

 

 

 