SIMSUPER5: Tunneling Construction Simulation
This paper presents SIMSUPER5 (SIMulation SUPERvisor version 5) a computer program developed to simulate the tunnel construction process under conditions of uncertainty. The program determines...
Computerized Construction Cost Estimating in County Government
Prior to establishment of a computerized contruction cost estimating system, four engineering divisions within the Department of Public Works in Fairfax County, Virginia, performed some...
Observations on Future Computerized Construction Research
A National Science Foundation sponsored workshop recently convened at the University of Illinois to help construction industry professionals determine the research needs and opportunities...
Army Life Cycle/Maintenance Prediction Model
The U. S. Army Construction Engineering Research Laboratory (USA-CERL) has developed a facility maintenance prediction model for the Department of the Army. This simulation model will...
Expert Systems for Dynamic Analysis Interpretation
Recent developments in expert systems technology have enabled expertise to be represented within a computer solution. This technology has allowed for the development of 'intelligent'...
Expert Systems in Construction Management: Microcomputer Application
Microcomputer based expert systems will assist construction industry by: changing the construction manager's role from day-to-day decision making to strategic planning and...
Construction Resource Analysis Using Symphony
In 1983, the Air Force was directed to commence engineering design of a small, single warhead ICBM for potential deployent in the early 1990's. As construction agent for the...
Computerized Construction Progress Control
In 1983 and 1984, an exploratory tunnel was constructed as part of the geotechnical exploration program for two highway tunnels to be constructed for interstate 70 through Glenwood Canyon,...
Advanced Microcomputer Simulation for Construction Managers
The concept of simulation allows the analysis of complex and dynamic systems such as those encountered in construction operations. In particular, the technology orientation of construction...
Microcomputer Expert Systems for Welded Construction
Stone & Webster Engineering Corporation has developed expert systems including various applications within the field of welded construction. Systems have been developed in the...
The Local Area Network in an Engineering Office
During the past several years, the St. Paul District, U. S. Army Corps of Engineers, has purchased a variety of computer equipment. In late 1985, the District solved the problem of communication...
The Engineering Workstation at Skidmore, Owings & Merrill
The computer group at Skidmore, Owings & Merrill has developed a unique workstation environment which aids both the generation of information in the design phase, as well as the...
A Method for Computerized Site Characterization
Site characterization, the process of evaluating subsurface soil, rock, and groundwater conditions and their impact on project design and construction is a common element in every major...
Purchasing a Small Computer System with the Aid of a Specification Document
Organizations can purchase equipment that meets their needs through the use of a performance specification document. Rather than specifying the 'nuts and bolts'...
Failures: Who Did It - How Did It Happen?
The forensic engineer investigates the cause of failures and determines, from an engineering viewpoint, who was responsible for that failure. These failures need not be catastrophic but...
How Do I Find the Information I Needed Yesterday?
One reason that the professional has not been more effective in learning from failures is that the information disseminated has not always reached the right people. The Architecture and...
Westway - The Little Word that Killed the Big Highway
The Westside Highway Project, better known as Westway, received a construction permit on February 25, 1985 from the Army Corps of Engineers. Signed by the author, the permit was invalidated...
Cost of Urban Runoff Quality Controls
This paper attempts to provide guidance in the evaluation, selection and planning of various BMPs by comparing their costs and cost-effectiveness, in terms of pollutant removal capabilities....
Transit Tactics: Keeping Light Rail Moving
The Guadalupe Corridor Light Rail Transit project is a massive undertaking that will be built in segments from San Jose to Santa Clara, CA. The $372 million project involves numerous agencies...
Shopping for a New Bridge Coat
Total shop coating of new steel bridges appears to be the best armor against corrosion. This alternative is one of three techniques for diminishing the difficulty and expense of painting...
Return to search