High Rise Express (Available in Structural Engineering Special Issue only)
A new column system developed by the Canam Manac Group in Montreal offers the expediency of steel construction with the economy of concrete. The system is made entirely of lightweight...

Covered Bridge Connection (Available in Structural Engineering Special Issue only)
A 145-year-old timber bridge in Downsville, New York, now rests on the longest glue-laminated wood beams ever produced in the United States. Six 53 m (174 ft) long chords were threaded...

Substructures Stack Up (Available in Structural Engineering Special Issue only)
As part of a 1997 research project sponsored by the Texas Department of Transportation and the Federal Highway Administration, the University of Texas at Austin Center for Transportation...

Analysis, Design, Construction, and Testing of Deep Foundations
This proceedings, Analysis, Design, Construction, and Testing of Deep Foundations, consists of papers presented at the OTRC `99 Conference...

Case Studies in Optimal Design and Maintenance Planning of Civil Infrastructure Systems
Sponsored by the Structural Engineering Institute of ASCE. This collection contains 19 papers on the optimal design and maintenance planning of civil...

Materials and Construction
Exploring the Connection
This proceedings, Materials and Construction: Exploring the Connection, consists of papers presented at the 5th ASCE Materials Engineering...

Structural Engineering in the 21st Century
This proceedings, Structural Engineering in the 21st Century, contains papers presented at the 1999 New Orleans Structures Congress held on...

Up against the Wall (available in Geoenvironmental special issue only)
A tight site in Portland, Oregon, bounded by existing roads and a light rail line and bordered by underground utilities, required project engineers to develop a new type of shoring wall...

Metal Building Systems: A New Look
The use of metal building systems in low-rise, non-residential construction under 150,000 square feet has grown from less than 50 percent in 1986 to almost 70 percent today. Such systems...

Robust Techniques for Extension of Streamflow Records
Longer hydrological records are required for the planning of water resource systems. Sensitivity of a system is studied under various scenarios of hydrological inputs to understand its...

Saving San Antonio
During an October 1998 flood, excess flow from the San Antonio River was funneled into a 3.1 mi (5 km) long, 24 ft (7.3 m) wide concrete-lined tunnel beneath the city that emptied into...

Geo-Engineering for Underground Facilities
The papers collected in this proceedings Geo-Engineering for Underground Facilities, summarize the practice of soil mechanics and engineering...

Crowning Achievement
The $800 million Sony Center built in Potsdamer Platz in Berlin is divided into seven structures which are all literally brought together under one roof. The fabric and glass roof, which...

Enduring Elegance (Available in Structural Engineering Special Issue only)
Every architect who designs for earthquake-prone areas wants to create an elegant aesthetic form despite the limitations of seismic considerations. The San Francisco International Airport's...

Towering Over Xiamen (Available in Structural Engineering Special Issue only)
Composite structural systems are rapidly becoming the preferred choice for high-rise buildings, due to their high strength and stiffness, large ductility, and convenient, economical construction....

Evaluation of the ISOGRID Retaining Wall System
Prepared by the Highway Innovative Technology Evaluation Center, a CERF service center. This report presents the results of a HITEC evaluation of the...

Tunneling under Trains
The Singapore deep tunnel sewerage system consists of a 90 km long tunnel network that will convey wastewater by gravity flow to two new secondary treatment plants being planned for the...

Exacting Renovation
In the heart of Greenwich Village a building that would typically be demolished given its current condition has been saved and restored with careful engineering and a precise demolition/construction...

Optimizing Post-Earthquake Lifeline System Reliability
This proceedings, Optimizing Post-Earthquake Lifeline System Reliability, contains over 100 papers presented at the 1999 National Conference...

Back from the Brink
The Cape Hatteras Lighthouse, the tallest brick lighthouse in the United States, has been moved to prevent it from toppling into the sea as a result of coastal erosion. Engineers from...

 

 

 

 

Return to search