Stochastic Modeling and Generation of Droughts
Stochastic simulation was used for deriving drought properties of the Poudre River, Colorado and the Red River, North Dakota. The autoregressive moving average (ARMA) model and a threshold...

Incremental Damage Assessment (IDA) For Lake Darling Dam
An Incremental Damage Assessment (IDA) has been completed for Lake Darling Dam, located on the Souris River, near Minot, North Dakota [1]. The IDA has indicated that a reduction in flood...

Convergence Experiments with a Hydrodynamic Model of Port Royal Sound, South Carolina
A two-demensional, depth-averaged, finite-difference, flow/transport model, SIM2D, is being used to simulate tidal circulation and transport in the Port Royal Sound, South Carolina, estuarine...

The Estimation of Extreme Floods in Brazil
In Brazil, the design flood of a large dam is calculated using either the Probable Maximum Flood criteria or the 10,000-year Flood. Recently a Guidebook has been written to help Brazilian...

Drainage Problems in a Highly-Developed Shoreline Area
Hilton Head Island, South Carolina, is a 42-square mile barrier island on the south-east coast Flooding of roads and properties is a continual problem in this low-lying, flat area due...

Elements of a Coastal Stormwater Drainage System
Several elements in the design of a stormwater drainage system that outfalls to the ocean are discussed. The paper discusses a study conducted of the Ocean Lakes Watershed near Myrtle...

Evaluation of TR-55 on Coastal Watersheds
Results of a study of the applicability of TR-55 to coastal watersheds are presented. Historical data were used to evaluate curve number, time of concentration and unit hydrograph peak...

Storage Reallocation in Hydropower Projects of North Georgia
Over the past 40 years, the Corps of Engineers has built nine multiple purpose storage projects in Georgia, with hydroelectric power production as a major purpose. Six of the projects...

Lopez-Angostura Power Tunnel
The Lopez-Angostura Project is located on the Yaque del Norte River in the Dominican Republic near the City of Santiago. A 24 m high dam, a 3.6 km long power tunnel, a pit powerhouse with...

Geology Related Construction Problems at the Urugua-i Hydroelectric Project
The Urugua-i Hydroelectric Project in north-eastern Argentina consists of an 80 m high roller-compacted concrete dam, 4.4 km long lateral dike, 800 m long power tunnel, and a 120 MW powerhouse....

Yacyreta Hydroelectric Project Turbine Design
This paper provides general information about this major hydroelectric project on the Parana River on the border between Argentina and Paraguay in South America. In addition, some specific...

Coastlines of Brazil
These papers were presented at Coastal Zone '89 the Sixth Symposium on Coastal and Ocean management held in Charleston, South Carolina, July 11-14, 1989. This volume is a...

Roller Compacted Concrete II
This volume includes the papers presented at the 1988 ASCE Specialty Conference on Roller Compacted Concrete. Included in the proceedings are experiences of roller compacted concrete dam...

Hydro Development on the Huallaga River in Peru
The proposed Chaglla Hydroelectric Project, is located on the Huallaga River in Central Peru, about 300 km north east of Lima. The available gross head of 870 m and regulated flow of 58...

Vilavilani Hydroelectric Project
There is an urgent need to solve the water and energy shortages in the Department of Tacna, on the coast of Southern Peru. The Vilavilani Hydroelectric Project could solve some of the...

Reservoir Regulation in the Monsoon Climate of Korea
An examination of reservoir regulation rules in light of uncertain estimates of river flow in the Han River Basin, Republic of Korea, shows that two strategies will improve total hydroelectric...

Saco Dam?South America's First RCC Dam
Because of cost and a lack of suitable embankment materials, Saco Dam at Nova Olinda in Paraiba, Brazil, was redesigned and built with lean roller compacted concrete (RCC). The structure...

Roller Compacted Concrete Design for Urugua-I Dam
Gravity dam construction by the roller compacted concrete method (RCC) has received widespread interest following completion of Shimajigawa Dam in Japan (1981) and Willow Creek Dam in...

Risk Assessment of Lake Shore Development of Devils Lake, North Dakota
In recent years, the advent of the flood insurance programs has forced developers, financiers, and planners to deal with future high water conditions and associated risks. A reliable method...

Colorado River Municipal Water District Weather Modification Program 1971-1986
The Colorado River Municipal Water District (CRMWD) has sponsored a rain enhancement program on summertime convective clouds in West Texas since 1971. Silver iodide is used for cloud base...

 

 

 

 

Return to search