Rock Excavation with Microwaves: A Literature Review
Research on the use of microwaves for breaking rocks started in the late fifties. In this paper, the principles of microwave heating and the possible mechanisms responsible for the breaking...
Settlement of Strip Foundations on Regularly Jointed Rock Masses
The analysis of a long, rigid strip foundation resting on the surface of a regularly jointed rock mass is presented. Two models of the overall rock mass are investigated; one in which...
New Design Method for Drilled Shafts from Common Soil and Rock Tests
A method is presented by which the compressive capacity and load-settlement characteristics of large drilled shafts can be computed from commonly executed soil and rock tests. The method...
Performance of High Capacity Caissons Founded on Decomposed Rock
The results of six load tests on large diameter caissons founded on decomposed rock are presented and analyzed. The caissons ranged from 1.5 m to 2.5 m in diameter and were 20 m to 23...
Skin Friction Load Test for Caissons in Residual Soils
Results of a load test on a drilled pier are presented. The test was performed to measure only skin friction of a 36 inch (0.91 m) diameter shaft without support at the end. The load test...
Geophysical and Nuclear Methods for Non-Destructive Evaluation of Caissons
Non-destructive testing techniques were used to confirm the concrete integrity on the caisson foundations for the 45-story Ohio Corporate Headquarters building in Cleveland, Ohio. The...
Pile-Drilled Caisson Combination for Foundation of High Rise Building
The analysis and evaluation of several alternatives for foundations of a high rise office building is presented, which resulted in the selection of a combination of high capacity piles...
Presented in 3-D
Stone & Webster started development in 1985 on a mainframe based computer system that provides the capability to integrate all plant information into a single integrated plant...
Computer Networking Needs in Engineering Technology
This paper deals with the planning and implementation of a local area network at the University of Arkansas at Little Rock in the new $13 million Engineering Technology and Applied Science...
Model Study of Side Slope Riprap
Laboratory experiments were conducted in 10-m long channels having 1.5 H : 1 V side slopes protected with a 20.7-mm diameter rock layer 1.5 diameters thick. Four models were tested. In...
A Coastal Hard Rock Sediment Budget for the Inner Bristol Channel
The dominant input into the inter-tidal zone from the hard rocks bordering the inner Bristol Channel is clastic material. This is derived from coastal recession as a result of subaerial...
Uplift under Concrete Dams on Rock
While the possible existence of uplift pressures within dams and foundations is no longer questioned, there is still considerable controversy over the magnitude and distribution of uplift...
Uplift Pressure below Gravity Dams on Rock
The magnitude of the uplift force at the base of a concrete gravity dam founded on rock is strongly dependent on the properties of the discontinuities within the rock mass. This paper...
Lopez-Angostura Power Tunnel
The Lopez-Angostura Project is located on the Yaque del Norte River in the Dominican Republic near the City of Santiago. A 24 m high dam, a 3.6 km long power tunnel, a pit powerhouse with...
Design Considerations for a Penstock Located in an Outlet Tunnel at the Jennings Randolph Dam in West Virginia
The proposed production of hydropower at this flood control-recreation dam involves the installation of a 78 inch diameter steel penstock at the crown of the existing tunnel. The penstock...
Dam Rehabilitation and Fish Lift Design at the Pejepscot Hydroelectric Project
The rehabilitation work on the existing rockfilled timber crib dam comprised an assessment of the existing dam stability; analysis of the existing hydraulic conditions to establish the...
An Evaluation of the Applicability and Cost of Polyester Resin and Cementitious Grouts for the Installation of Rock Anchors at Hydro Projects
The success of two proposed hydropower projects in the States of Virginia, and West Virginia depended on the ability of a rock anchor system to support the penstocks at the crown of the...
Visual Scheduling
This paper presents a look at new innovative way to provide project schedule. The primary target is in visual scheduling presentation techniques. The systems presented include a system...
Large Capacity Rock Anchors Stabilize Bagnell Dam
Evaluations of spillway discharge capacity and stability of structures for the Osage Hydroelectric Project indicated that the Project was unsafe during the occurrence of the Probable Maximum...
The Rehabilitation of Lake Harriet Dam
In 1984, the decision was made to rehabilitate the Lake Harriet Dam. The existing arch dam structure was encased with a rockfill buttress. The downstream buttress, which also acts as a...