Concurrent E-I Algorithm in Structural Dynamics
A concurrent explicit-implicit algorithm for time integration of the differential equations arising from a finite element discretization is described. The first step of the method consists...

State and Resource Based Construction Process Simulation
Stroboscope is a programming language for construction process simulation. The programming language provides access to the state of the simulation and to the properties of resources. It...

Multi-Objective Optimization of Construction Schedules
This paper focuses on the multi-objective deterministic and stochastic modelling and optimization of construction tasks scheduling. Of particular importance is a frequency need to satisfy...

Using Computer Programs to Develop As-Built Schedules
An as-built schedule documents how a project was built over time. It indicates the start and the end dates of each activity during the construction. This schedule is often used to evaluate...

Linguistic Analysis of Risk in Project Planning
Construction risk analysis models are mainly based on quantitative techniques which require numerical data. However, in many cases, the available information related to uncertainty factors...

Quality of Map Data in Geographic Information Systems
Local government engineers wanting to take advantage of computer aided design (CAD) and geographic information system (GIS) need to understand the quality and accuracy of digital base...

TIGER and Census Bureau Data in a GIS: A Powerful Combination for Civil Engineers
TIGER is the acronym the Census Bureau crated to identify its computerized geographic support system: the Topologically Integrated Geographic Encoding and Referencing System. Although...

Computer Model for Infiltration System Design
This paper describes a personal computer model which was developed to assist in the design and analysis of infiltration systems. The systems included in the model are infiltration basins,...

An Information Engineering Approach for Environmental Impact Assessment and Monitoring Program
Environmental impact assessment studies cover a number of activities for: data collection, data analysis, numerical modeling, system monitoring, and regulation compliance. The diversified...

Intelligent Design and Remediation of Shallow Landfill Burial Systems
The SLEUTH (Shallow Landfill Evaluation Using Transport and Hydrology) prototype decision support system (DSS) has been developed for design and remediation of shallow landfill burial...

Representing Design Cases Based on Methods
This paper discusses an approach to representing design cases using the methods used in solving specific design problems. This differs from the conventional representation of design cases...

Case Storage of Planning Knowledge for Power Plant Construction
Schedulers consider a variety of constraints when they analyze a project to schedule the construction work for it. Often they will start from some schedule that they recall from a previous...

Representation of Case Memory for Structural Design
One of the major issues to be addressed in the application of case-based reasoning to structural design is the representation of design projects in case memory. The content of the information...

Advances and Challenges in Case Based Design
The application of the case-based design (CBD) method to preliminary building design provides an opportunity to overcome problems associated with traditional computer-based design methods....

Modeling to Generate Alternatives in Discrete Structural Optimization
Structural design, like other complex decision problems, involves many trade-offs among competing criteria. While mathematical programming models are increasingly realistic, there are...

The Safety Advisor: An Interactive Object-Oriented Program for Assessing the Safeness of Roadway and Roadside Designs
This paper describes an object-oriented software tool for performing safety assessments of roadway designs. Safety assessments are used to estimate the effect of changes in roadway characteristics...

An Object-Oriented Scheduling Data Acquisition Model Using a Hybrid Expert System
Acquisition of scheduling data for construction project information management is a complicated task. Historically, there has been a fundamental disconnection between cost estimation and...

Simplified Simulation Model Development for Construction Projects
The application of discrete event simulation tools is extremely beneficial in improving the efficiency of building construction activities. Simulation is used to evaluate construction...

The MOUSE Uncertainty Analysis System
MOUSE (Modular Oriented Uncertainty SystEm) is a Monte Carlo based simulation system designed to deal with the problem of uncertainties in Environmental engineering calculations, such...

Probabilistic Modeling of Scheduling Uncertainty: Methods and Tools
This paper provides an overview of probabilistic project scheduling methodologies and tools. It emphasizes the practical application of Monte Carlo simulation in modeling activity durations....

 

 

 

 