Cables Not in Trouble
Cable-stayed bridges in the U.S. are not, contrary to reports widely disseminated in the press several years ago, about to fail from corrosion. The design, in which primary cables support...
Pipeline Rehab: Underground Options
While simply digging up old pipes and replacing them is sometimes still best, other alternatives can give long life while easing the strain on the community. Trenchless methods for on-line...
Developing High-Risk Scenarios and Countermeasure Ideas for Mitigation of Hazardous Materials Incidents
Kansas State University (KSU) conducted a comprehensive study of the development of a set of prioritized, extreme-risk scenarios, the development of a set of feasible, practical and implementable...
Are We Ready to Face the Geotechnical Challenges of the 21st Century?
The geotechnical engineering profession faces a bright future as many of the issues of interest to society today relate in some form to knowledge of earth sciences. Hazardous waste, environmental...
Soil-Cement Mixed Wall Technique
This paper introduces the soil-cement mixed wall technique and its applications for the installation of cutoff walls, excavation support walls and soil-crete columns for soil stabilization....
KBES Applications to the Selection and Design of Retaining Structures
Knowledge-based expert systems (KBES) are computer programs, based on artificial intelligence (AI) techniques, designed to reach the level of performance of a human expert in some specialized...
Evaluation of Geotechnical Design Parameters by Expert System Techniques
This study refers to application of an artificial intelligence technique to evaluate geotechnical design parameters in the soil design definition. This complex evaluation is incorporeted...
Use of a Tie-Back Retaining Wall to Stabilize a Moving Landslide
After failure of a gravity retaining wall, a moving landslide was stopped and stabilized by a tie-back retaining wall. The design considered the active landslide and residual strength...
Watertight and Earthquake Resistant Joints for Diaphragm Walls
Different types of joints were constructed and tested in the field to evaluate the bond between concrete and partition plate, the effect of tremie pipe location to the quality of concrete...
Within the North Wall of Hugo (Personal Recollections of Being in the Wrong Place at the Wrong Time)
Our house is in Romain Retreat, a subdivision of lots of 1 1/2 -3 acres in Awendaw, S.C. approximately 20 miles northeast of Charleston off Route 17 and about the same distance from McClellanville...
Hugo 1989 - The Performance of Structures in the Wind
The performance of buildings in the Carolinas during Hurricane Hugo, 21-22 September 1989, is reviewed. Wind speeds in most locations were below the design levels specified in the local...
Performance of Building Resistance to Water, Waves and Erosion
Water damage to buildings due to Hugo was widespread and severe throughout low-lying coastal areas. Flood insurance claim payments have already exceeded $350 million, the largest payout...
Hurricane Hugo's Effect on Marina Structures
The author has visited over twenty-five sites along the South Carolina coast and in Puerto Rico to ascertain the effects of Hurricane Hugo on marina facilities. Types of structures evaluated...
Hugo's Sturctural Damage in Puerto Rico
The results of a study of the wind damages caused by Hurricane Hugo is presented. Cases involving wood structures, industrial steel buildings, multistory reinforced concrete buildings,...
Advisory and Mitigation Activities in the Carolinas
To effectively reduce losses from hazard occurrences, an active and agressive mitigation program is needed. Following Hugo, several important activities have been initiated, utilizing...
Structural Engineering Lessons Learned From Hurricane Hugo
Hurricane Hugo purported to be 'The Storm of The Century' caused considerable property damage over a tremendously large area effecting nearly everyone and every...
Architectural Lessons Learned From Hurricane Hugo
All of us in the building design professions have learned many lessons in the last year since Hugo. My experience, as with many of us in the design profession in Charleston, has been on...
Hugo - Lessons Learned
This paper is based on ground surveys along the South Carolina coast from Edisto Island north to Myrtle Beach. It also includes ground surveys as far inland as Charlotte, North Carolina....
Masonry Performance in the Coastal Zone
Investigators from the National Concrete Masonry Association (NCMA) surveyed the coastal areas of South Carolina from Charleston to Myrtle Beach during a seven day period just after hurricane...
Lessons Learned From Hugo About Building Design Trends
An investigation of 100 buildings was made to evaluate their resistances to Hurricane Hugo which occurred on September 21 and 22, 1989 at Charleston, South Carolina. A nearby anemometer...
Return to search