Reclaiming the Uncompleted Project of Another Development A-Case Study
This paper will examine the problems encountered when a second organization assumes control of a project from an earlier developer that could not carry the project through to completion....

Market Projections for the Hydroelectric Industry
The hydroelectric industry enjoyed a rapid rate of development from 1980 through 1986. This expansion was fed in part by a combination of tax incentives, the PURPA legislation, and high...

Development of Turbine Intake Downstream Migrant Diversion Screen
Prior to the spring of 1986 Public Utility District No. 2 of Grant County had developed a passive turbine intake screen design. A prototype of this design was placed in the emergency gate...

Arbuckle Mountain Hydro Vertical-Axis Fish Screens
Fish screens to exclude small fry and debris at remote sites such as Arbuckle Mountain Hydroelectric Plant post unique design considerations to satisfy criteria established by fisheris...

Fish Mortality at a New Low-Head Hydroelectric Plant
A study was developed for the Morrow Plant to investigate the potential for turbine related mortality of entrained fish. Morrow Lake supports a small sport fishery, mainly for smallmouth...

An Approach to Addressing Interactive Effects of Multiple Hydro Projects in a River Basin
Cumulative effects issues continue to arise, not only related to multiple small hydro projects, but also to multiple relicensing of major projects, development of multiple projects at...

Cumulative Impact Assessment: Issues to Consider in Selecting a Cumulative Assessment Method
Because widespread interest in the subject is new, there are no standard or generally recognized methods for cumulative impact assessment. A method should include procedures for (1) evaluating...

Environmental Appraisal of Small Hydro Projects in Ontario
Despite a large interest from the developing community and the aid of Ontario's Small Hydro Encouragement Program (Ministry of Energy 1986) which is administrated by the Ontario...

Field Experiences in Improving Water Quality Downstream From Dams
Recent experiences by the Tennessee Valley Authority in improving water quality and fish habitat downstream from dams are presented. At Douglas Dam, floating pumps near the surface of...

Reservoir Releases Improvements?Requiem for Integrating Pollution Control and Resource Management Programs?
To better define the interrelationships between economic growth and development, pollution control, and water resource management, TVA conducted two studies that examined how reservoir...

Downramping to Minimize Stranding of Salmonid Fry
The objective of this study was to develop a downramping regime for the Jackson Hydroelectric Project on the Sultan River in Washington that minimizes the stranding of juvenile salmon...

Hydropower Simulation: An Overview
Numerous models have been developed for production costing and generation system expansion which include operation of hydropower in the system. These models rely on energy production and...

Power System Study to Determine Hydro Benefits
This paper discusses evaluation methodologies used by Stone & Webster to determine the power benefits for six potential hydropower projects at existing U. S. Army Corps of Engineers...

Reliable Operation of Hydro-Thermal Power Systems
The demonstrated model allows planners to account for both operating and shortage costs, subject to a constraint on the system failure rate. In addition, the optimal long-term operation...

Pumped Storage and Power System Operations
The 2100 megawatt Bath County pumped storage power station began commercial operation in December 1985 as a jointly-owned project of Virginia Electric and Power Company (Virginia Power)...

Operational Flexibility?A Precious Commodity
This discussion is about Operational Flexibility, as it applies to the generating resources of a large electricity system. The author discusses the situation at Ontario Hydro, operationally...

A Short-Term Hydro Scheduler for Hydro-Thermal Power Systems
This paper presents HYDSIM (Hydro-electric Simulation), a new versatile computer model developed to simulate the hourly or daily operation of a large network of multi-purpose reservoirs...

Real Time Hydropower Scheduling for Niagara Mohawk Power Corporation
Niagara Mohawk Power Corporation (NMPC) presently manually schedules their hydro system of 660 MW (80 stations in ten river basins). The scheduling procedures are labor intensive and relatively...

Hydropower Development of China's Yangtze River
The Yangtze has eight times the hydro potential of the Columbia River basin, currently the largest developed hydro system in the world. In order to pursue economic development through...

Rain Data Telemetry for Operation of a Hydro-Reservoir
The Collywobbles hydro-electric station operates 42MW with very little river storage. Raindata is collected from 11 gauges distributed in the 5000 km**2 catchment and telemetered to a...

 

 

 

 

Return to search