Unsaturated Soils
This proceedings, Unsaturated Soils, consists of papers presented at sessions of the 1993 ASCE National Convention and Exposition held in Dallas,...

Waterpower '93
This proceedings contains the papers presented at the Waterpower '93 conference held in Nashville, Tennessee, August 10-13, 1993. The conference brought together owners, planners,...

Vietnam: Worth Looking Into
If it is to enter the world economy, let alone play catch-up with the booming economies of some of its neighbors, Vietnam requires massive numbers of infrastructure projects: roads, bridges,...

Engineering Sustainable Development
Despite some isolated environmental victories in the past few decades, on a system-wide level the problems�from acid rain to destruction of the rain forest�are getting worse. Can humanity...

Finite Element Analysis of Reinforced Concrete Structures II
This proceedings, Finite Element Analysis of Reinforced Concrete Structures, presents papers from an international workshop sponsored by ASCE-ACI...

Guidelines for PC-Based Data Acquisition Systems for Hydraulic Engineering
Guidelines for PC-Based Data Acquisition Systems for Hydraulic Engineering reviews the state-of-the-art in personal computer-based data acquisition...

Reliability and Uncertainty Analyses in Hydraulic Design
Prepared by the Subcommittee on Uncertainty and Reliability Analyses in Design of Hydraulic Structures of the Technical Committee on Probabilistic Approaches to Hydraulics of ASCE. ...

Tying Up The Artery
After six years, preliminary design is almost complete on one of the nation's largest, and most complicated, public works project, the Boston Central Artery project. At an...

Can Engineers Cut Curtain-Wall Failures?
For many reasons, including owners' false perception of economy engineers have abdicated responsibility for curtainwall design. Failures of curtainwall components are very...

Airport Towers: A New Generation
Airport control towers are a unique building type with monumental significance, both for the cities that own and operate the airports, and for the FAA which owns and operates them. Airport...

So Much Pavement, So Little Time
At its most basic, pavement management requires taking inventory of a pavement network, doing a condition assessment, setting up a database, then synthesizing the data collected for an...

Egypt's Real-Time Water Management
The challenge and complexity of efficiently managing the distribution of the 55 billion m that Egypt draws from the Nile every year has prompted the country's Ministry of...

Geosynthetics Conquer the Landfill Law
Los Angeles' last operating landfill is undergoing a major expansion using innovative materials in the liner system to overcome difficult site conditions. The design represents...

Overcoming the Woes of Worldwide Work
The author, a civil engineer based in Gibraltar, discusses a variety of pitfalls encountered in international practice, with case histories and lessons learned. They can be caused by differences...

High-Performance Construction Materials and Systems
An Essential Program for America and Its Infrastructure?Executive Report
Prepared by American Concrete Institute; American Institute of Steel Construction; American Iron and Steel Institute; ASCE; Civil Engineering Research Foundation; Concrete Research and...

Federal Public Works Infrastructure R&D
A New Perspective
Prepared by the Civil Engineering Research Foundation. This report provides an analysis of the federal role in public works infrastructure research...

Dynamic Response and Progressive Failure of Special Structures
This proceedings, Dynamic Response and Progressive Failure of Special Structures, consists of papers presented in the two sessions of the First...

Elected Officials
Schools and organizations train engineers to use facts. But, engineers are often content to base decisions on their opinions. While engineering judgment is an important part of the professional...

Appendix B: Ten Primary Reasons for Failure in Negotiation
Back matter pages come after the papers or chapters in a published work. This back matter contains ten primary reasons for failure in negotiation....

In-Service Durability Evaluation of Armourstone
A summary flow diagram for rock evaluation, general to all rock types and engineering applications of rock is introduced. It is then applied to armourstone. Increasing detail within this...

 

 

 

 

Return to search