Techniques for Balancing Instream Flow Needs with Project Operation
Balancing power and non-power benefits of hydroelectric developments has become a controversial issue in the relicensing of projects. Multiple project and multiple objective flow management...
Using Project Management Techniques in Hydro-Relicensing
To answer a pressing need for managing today's complex process and requirements of hydro relicensing, Central Maine Power Company (CMP) has applied the principles of project management,...
Document Image Systems for Hydro License Compliance
This paper will present one company's experience in selecting and implementing a document imaging system for management of correspondence, environmental studies, dam safety...
EPRI's Pumped Storage Planning and Evaluation Guide
EPRI's Pumped Storage Planning and Evaluation Guide was published in 1990. The Guide provides step-by-step procedures to: (a) evaluate pumped-storage operation in a utility...
More Power to the Allegheny?Design of the Allegheny 8 & 9 Hydroelectric Stations
The 13 MW Allegheny 8 Hydroelectric Station and the 17 MW Allegheny 9 Hydroelectric Station are located on the Allegheny River in the Commonwealth of Pennsylvania. The generating facilities...
Undeveloped Hydropower Resource Potential
The public hearings conducted as part of the National Energy Strategy produced testimony that concluded that the potential for development of hydropower was not well defined. As a result,...
Small Hydro Site Ranking, Cost Methodology and Program
The user-friendly micro-computer program SHYDRO for costing small hydro has been prepared for the government of Canada and is available in the public domain. SHYDRO was initially applied...
Load/Resource Matching for Period-of-Record Computer Simulation
The Southwestern Power Administration (Southwestern), an agency of the Department of Energy, is responsible for marketing the power and energy produced at Federal hydroelectric power projects...
Computer Modeling of Reservoir Sedimentation and Sluicing
A recently developed computer program which simulates the evolution, growth, and movement of a submerged delta in reservoirs was tested for Spencer Dam and Reservoir in Nebraska. The code,...
Decision Rules for Reservoir Releases
One of the problems faced with computer modeling of a multi-reservoir, hydro-power system is making decisions on how releases will be made. Reservoirs many times have multiple demands...
Development of a New Hydraulic Design Tool for Spiral Casing/Distributor Geometry
A novel computational model has been developed to predict highly complex turbulent flow in a combined spiral casing/distributor geometry. Validation of the computational model against...
Optimal Real-Time Control of Hydroelectric Power Plant Using Dynamic Programming
In this paper, an approach of optimal real-time control of hydroelectric power plant operations is presented. The methodology is based on a dynamic programming technique where the original...
Hand Held Powerhouse Control Console or Portable Data Terminal
The Portable Data Terminal (PDT) is a very small light weight hand held computer terminal that communicates with the control system computer by radio. An operator monitors power plant...
A Hydroelectric Plant Operator's Assistant
This paper describes a PC based application designed to assist in the process of enhancing the performance of multi-unit hydroprojects. Optimization considerations, uses of the Operator's...
Ferroresonance & the Snettisham Hydroelectric Project
Key system features of the Snettisham power plant in Alaska will be highlighted along with a discussion of the operational problems encountered due to a ferroresonant condition. The project...
Voltage Regulator Influence on Generator System Stability
During initial startup of a generator system, it is not uncommon to witness generator voltage instability. Most of the time, the solution is reduced to returning the stability control...
Design Considerations for Radial Key Retrofit
A practise that is becoming more and more common is to retrofit hydro-electric generators with Radial Key Systems. There are significant design considerations that must be made to ensure...
Validation Studies on Indexed Sequential Modeling for the Colorado River Basin
A method called indexed sequential modeling (ISM) has been developed by the Western Area Power Administration to estimate reliable levels of project dependable power capacity (PDC) and...
Utilizing Wetlands for Stormwater Retention
The design steps an engineer uses to develop natural wetlands to provide flood control while continuing to retain their natural functions will be analyzed. This paper will include a discussion...
Operation of Hydropower Plants Considering Daily Streamflows
Operation of hydropower plants is a sequential decision process often modeled as a dynamic programming problem. Typically, such formulations consider monthly stages assuming that monthly...