Hydrographic Surveying Turns to Electronics
Traditional technique for measuring water depth is to use a lead-weighted line. The tag line, stretched along the water surface so soundings are made in orderly fashion, can be dangerous....

Recording River and Reservoir Water Depth
At the Kerr Reservoir on the Roanoke River in Virginia and North Carolina, reservoir bottom was surveyed before reservoir filling and twice thereafter, to determine rate of siltation....

Seattle Freeway Park; A Scene of Blissful Contrasts
The Seattle Freeway Park was nominated for honorable mention for OCEA. Although not of massive scale and not dramatically innovative in civil engineering design and construction methods,...

A Hydrographic Surveyor's Most Memorable Day
Holbert Fear's most memorable day in a career as a hydrologist with the U.S. Geological Survey was in 1917, near Hanna, Wyoming. Fear was sent out to measure the flow of the North Platte...

Minnesota Interceptor Sewer Breaks New Ground
The Beltline Interceptor is a gravity interceptor sanitary sewer which has its outlet in St. Paul and its beginning in White Bear Lake. Major requirements called for a design which would...

Ecology and the Past
Archaeologists and paleontologists have gathered an overpowering amount of evidence to show that modern methods of construction, both in the field of highways and in that of architectural...

Pasco-Kenneewick Bridge�� The Longest Cable-Stayed Bridge in North America
This 2503-ft long structure, built in an earthquake zone, is only the second of its kind to be constructed in the U.S. It boasts a continuous concrete girder, supported from steel cables...

Granular-Fill Dam Protected by PVC Membrane
The design and construction of the Minorca Tailings Basin Starter Dam sets a precedent for the use of plastic membrane for seepage control in the construction of earth fill dams where...

Design/Construct Companies�� Builders for Industry
Highlights in the evaluation of design/construct companies. How Koppers is establishing better dialog with all 7,000 professional employees. How Fluor has grown thanks to gutsy hiring...

Precast Liners May Cut Tunnel Cost 25%
On the Bureau of Reclamation's Buckskin Mountain's Tunnel in Arizona, the low bid was for $58,000,000, about $21,000,000 less than the low bid for design using...

A Critical Appraisal of Some Proposed Changes to the 1972 Water Pollution Control Act
The amendments that will ultimately be made to the 1972 Water Pollution Control Act (PL 92-500), now being discussed by Congress, will be influenced by a number of things happening in...

Guide for Surveying Visitors on ECPD/EE&AC Accreditation Teams
This Guide for Surveying Visitors on ECPD/EE&AC Accreditation Teams provides guidelines for accreditation of surveying programs which...

Guide for Collection, Analysis and Use of Urban Stormwater Data
Proceedings of the Collection, Analysis, and Use of Urban Stormwater Data Conference held at Tidewater Inn, Easton, Maryland, November 28 December 3, 1976. Sponsored by the Engineering...

The CRT Computer-Graphics Terminal: Indispensible Design-Aid for Some Structural Engineers
Putting the benefits of computer graphics within the cost reach of many consulting firms are: the development of low-cost ($3,000 to $10,000) storage-tube CRT graphics terminals; and the...

Steel Frame, Precast Floors Meet Impossible Time Constraints
Only 13 months were allotted for expansion of the Captain Cook Hotel in Anchorage, Alaska, which meant that construction would have to continue through the winter months with little down...

Automatic Surveying � Updating Canada's Control
With Litton's Auto-Surveyor system you can perform third-order surveys driving at highway speeds or flying in a helicopter. With proper planning...

City's Topographic Mapping System Saves Time, Money and is More Accurate
The city of Elgin, Ill. purchased its own topographic mapping system called Topo-Plan. The system consists of an aerial photo base map plus a transparent overlay showing 2-ft (0.60-m)...

Water Harvesting�� Modern Application of an Ancient Method
Water harvesting�The process of collecting natural precipitation from prepared watersheds for beneficial use was the topic of a 3-day symposium held in Phoenix, Arizona, in March 1974....

Numerical Methods in Geomechanics
Proceedings of the Second International Conference on Numerical Methods in Geo-mechanics held at Virginia Polytechnic Institute and State University, Blacksburg, Virginia, June, 1976....

Subsurface Investigation for Design and Construction of Foundations of Buildings
This purpose of Subsurface Investigation for Design and Construction of Foundations of Buildings is to set forth the reasoning that guides...

 

 

 

 