Effectiveness of a BioInfiltration BMP
This paper presents results from a project to construct and study a BioInfiltration Traffic Island on the grounds of Villanova University. The projects goals were to 1. To create a bioretention...
Panel Discussion on Stormwater Issues in Pennsylvania
The management of stormwater in Pennsylvania has radically changed over the last several years due to the concern of the citizens of the Commonwealth, and the advent of NPDES Phase II....
The Pocono Creek Goals-Based Watershed Management Pilot Study-Phase 2
Phase 2 of the Pocono Creek Pilot Study begins with focusing on the issues identified in Phase 1 and prioritizing them on a watershed wide scale. The Pocono Project worked through the...
The Benefits of Virtual Building Tools
Several short case studies illustrate how virtual building tools enable designers, builders, and owners to test any aspect of a project's design, organization, and schedule...
The Big Dig's Big Dig
Widely recognized as the most demanding component of Boston's Central Artery/Tunnel Project, the tunnel jacking work performed beneath operating rail tracks represents a quantum...
Joining Forces
In times of limited funding, roads and mass transit are sometimes seen as competing interests, but in Denver the two are united in a massive effort to reinvent an aging and congested transportation...
Northeast Passage
It will take a deft hand to manage the many aspects of this massive highway and mass transit project along interstate 95 in Connecticut. CAreful construction staging and detailed traffic...
The Smaller the Better
Many wastewater treatment plants in the United States seeking to expand or upgrade their facilities often face space limitations. But now a number of small-footprint technologies refined...
Ramping Up
The reconstruction of the Sprinfield interchange, also known as the Mixing Bowl�one of the largest, most complex highway projects in the nation�has reached the halfway point. But some...
Under Cover
In capping a 190-acre hazardous landfill in metropolitan Los Angeles, engineers saved time and money by relying on a construction method seldom used in the environmental sector: design/build....
Application of the NRC Framework for Evaluation of Remedial Actions at a PCB Contaminated Sediment Site
The National Research Council recently proposed that the framework of the Presidents/Congressional Commission on Risk Assessment and Risk Management be applied to the selection and implementation...
A Realistic Vision for the Future of IT in Civil Engineering and a Plan for Achieving It
In October 2001, a group of experts from the capital projects industry met in San Antonio, Texas to begin development of a comprehensive technology research and development (R&D)...
Measuring Productivity: An Industry Challenge
Is the design and construction industry more productive today than it was a decade ago? Is it matching the achievements in productivity attained by other industries? Are technological...
Wide Open
The retractable roof of the stadium being built for the Arizona Cardinals will be the first in the United States to operate on an incline, and the extraordinary trusses that support it...
Singapore on the Move
Tunneling in areas that are densely populated and highly developed is never easy, but an addition to Singapore's Mass Rapid Transit system was needed to serve those in the...
Failures and Problems with Lift-Slab Construction
This chapter provides an overview of failures and problems with lift-slab construction. Topics include jack systems with inadequate take-up devices; the Canadian wedge connection; Serra...
Water and Wastewater Seismic Vulnerability Assessment and Loss Mitigation Overview
The basic steps of a loss mitigation program for water and wastewater systems are briefly described in this section. These steps demonstrate how the checklists may be used to compliment...
Seismic Screening of Water and Wastewater Facilities with Checklists
This section briefly discusses the use of checklists for the seismic screening of water and wastewater facilities. Topics include limitations; level of effort; screening team selection;...
Source Facilities and Components
This section provides a brief overview of water and wastewater source facilities and their components. Checklists are included....
Storage, Distribution, and Collection Components
This chapter provides an overview of water and wastewater storage, distribution, and collection components. Checklists are included....
Return to search