Failures and Problems with Lift-Slab Construction
by Rubin M. Zallen,David B. Peraza,
Part of: Engineering Considerations for Lift-Slab Construction
Abstract:
This chapter provides an overview of failures and problems with lift-slab construction. Topics include jack systems with inadequate take-up devices; the Canadian wedge connection; Serra High School roof; Pigeonhole parking garage; and collapse of L'Ambiance Plaza.
Subject Headings: Slabs | Parking facilities | Failure analysis | Concrete construction | Urban areas | Structural failures | School (K-12)
Return to search