Dredge Spoil Disposal Predictions and Performance: A Case History
A 146-acre dredge spoil disposal facility was constructed in Baltimore Harbor that received 3. 4 million cubic yards (2. 6 million cubic meters) of dredge spoil generated from construction...
Consolidation of Mining Wastes
This paper describes laboratory and field tests for determining consolidation properties of soft sediments, presents data on several types of mining wastes, and presents the results of...
Perspectives on Modelling Consolidation of Dredged Materials
The physical and mathematical aspects of this problem are highly nonlinear and material-property relationships extend beyond the scope of standard geotechnical engineering. The potential...
Yield Behaviour and Consolidation. I: Pore Pressure Response
This paper discusses the frequency of occurrence of anomalous consolidation behaviour. The behaviour of soft clay is discussed briefly in terms of the effective stress path/yield envelope...
Consolidation of Permafrost upon Thawing
Methods of predicting initial consolidation upon thawing and the subsequent consolidation with time under increasing pressures are presented in terms of changes in unit weight. Procedures...
Time and Stress Dependent Compression in Soft Sediments
Results are presented for laboratory experiments using a typical estuarine mud settling from a slurry in columns of 100mm diameter. Measurements have been made of density and pore water...
Instrumentation Performance in Soft Clay Soils (A Case History)
In 1978, IDEAL BASIC INDUSTRIES, INC. initiated construction of a cement manufacturing plant located south of Mobile, Alabama on the Theodore Ship Channel. Because deltaic clays were too...
Sedimentation and Self Weight Consolidation of Dredge Spoil
Test results suggest that self weight consolidation begins when an interface forms in the settlement column and the slurry reaches a critical concentration as a result of the solid particles...
Dredged Slurry Stabilization for Seagirt Marine Terminal
The Seagirt Marine Terminal is constructed on reclaimed land on dredged spoil from the I-95 Fort McHenry Tunnel in Baltimore, Maryland. Three stabilization procedures considered applicable...
Prediction of Viable Tailings Disposal Methods
A sand-fines-water diagram is proposed to analyze and describe slurries composed of coarse and fine particulate matter. The diagram can be used to predict and plan disposal methods for...
Centrifugal Modeling of Phosphatic Clay Consolidation
As a by-product of beneficiation, quantities of dilute clay slurry are produced which are stored in retention ponds. One method of accelerating consolidation is to surcharge the clay with...
Pavement Recycling: Stopgap or Remedy?
Recycled pavements cost less than new asphalt concrete overlays, but no long term data has ratified how recycled pavements' strength and durability compare to virgin material....
Wetlands Development in Moderate Wave-Energy Climates
For the last three years springs of Spartina alterniflora have been planted on portions of Theodore Island, a dredged material island in Mobile Bay, Alabama. The purpose of the planting...
Monitoring of an Ocean Dredged Material Disposal Site
The Tampa Harbor Project involves deepening and widening approximately 50 miles of existing shipping channel in Tampa Bay, Florida, with the removal of approximately 70 million cubic yards...
Thalweg Disposal: Demonstration of an Alternative
Disposal of dredged material in the main channel, or thalweg, is an alternative disposal option for maintenance dredging. The material dredged from the Upper Mississippi River is clean...
A Methodology for Open-Water Disposal Site Selection
Pascagoula, Mississippi, is the major industrial region in coastal Mississippi. The existing project, completed in 1965, provides for waterborne transportation from the Gulf of Mexico...
Charlotte Harbor Beach Nourishment
The project consisted of dredging approximately 300,000 cubic yards (229, 380 cubic meters) of material, utilizing a seagoing hopper dredge, from the entrance channel of Charlotte Harbor,...
Management Plan for Dredged Maintenance Material
The Mobile District Corps of Engineers is responsible for the maintenance of an authorized Federal deep-draft navigation project at Pascagoula Harbor, Mississippi. The development of the...
Offshore Dredging - Is it still Cost Effective for Beach Restoration?
Offshore dredging has been the source of sand for beach restoration in southeast Florida since Broward County constructed the first project in Pompano Beach in 1970. However, with increasing...
Land Application of Dredged Material at Port Manatee
Maintenance dredging of approximately 600,000 cu yd of highly plastic clay was conducted in October 1983. This material was deposited on a nearly 200 acre tract of farmland in a depth...