Value Engineering Made Mandatory on EPA Projects Over $10,000,000
EPA makes VE mandatory on projects over $10 million. Eleven VE teams in five 40-hour workshops. Isolated changes of $1.2 million on typical $4.1 million project which were acceptable to...
New Era in Fire Protective Coatings for Steel
Building designers have been receptive to new approaches to fireproofing steel. Among alternatives to traditional fireproofing now on the market: (1)Medium density inorganic systems such...
Earth Retention by Drilled Reinforced Concrete Caissons
A hillside fill is stabilized by the construction of drilled reinforced concrete caissons. The fill supports a building which houses equipment important to a manufacturing process. Other...
Zinc Paint Can Save $500,000 On Your Powerplant
Zinc-rich paints have been used for 20 years now. However, those responsible for protecting powerplants and many other utility and industrial structures are still using the alkyd paints....
The Recycling of a River
After a century of neglect and degradation, the South Platte River is undergoing a process of transformation to become the most significant recreational resource in the Denver area�� a...
Economics of Preventive Highway Maintenance
The preventive maintenance concept for asphaltic highway surface care is intended to give all areas of the Kansas Department of Transportation the necessary procedures for such work. The...
Experts Critique the Olympic Structures of Montreal
At a panel discussion held recently in Montreal, a number of prominent architects and engineers critiqued the Montreal Olympic structures. Unlike some previous press reports, the blame...
Structural Analysis and Design of Nuclear Plant Facilities
Draft Trial Use and Comment
This Manual of Engineering Practice in
Structural Analysis and Design of Nuclear Plant Facilities
Draft Trial Use and Comment (Supplement)
Structural Design of Nuclear Plant Facilities
Proceedings of the Second ASCE Specialty Conference on Structural Design of Nuclear Plant Facilities, held in New Orleans, Louisiana, December 8-10, 1975. Sponsored by the American Society...
Subsurface Investigation for Design and Construction of Foundations of Buildings
This purpose of
Planning and Design of Tall Buildings
Scope Index
This report, Scope Index, was originally part of Joint Committee Report 1 as Schedule 2.1. It is an alphabetical listing of the scope of the various chapters of the Monograph on Tall Buildings....
Washington, D.C. Mall Tunnel
The 4,002 ft (1220 m) cut and cover tunnel crossing the Mall just west of the U.S. Capitol created some unusual construction and design problems. Three areas warrant special mention. These...
How Concerned Should Civil Engineers be with Fire Protection�
During the last five years, there has been increasing concern and interest in fire safety in buildings, especially tall buildings. This has resulted in new federal legislation, a new General...
Designing for the Disadvantaged: Optimum Design Considers All Users
Design practices in recent engineering projects show that consideration for the full human utility of building and transportation systems is receiving increasing attention. Previously,...
Canadian University to Launch Building-Engineering Program
To meet the practical needs of the building industry, Sir George Williams University (Montreal) plans to launch this fall a building-engineering program. The new curriculum is expected...
New Method Dewaters Dredged Material, Cuts Lagooning Space
Disposal of the millions of cubic yards of dredged material produced each year in the maintenance of the nation's waterways is becoming a serious problem. Traditional methods...
9000 psi Concrete�� Why? Why not�
High strength concrete is being used in many high-rise apartment and office buildings. In this case, high strength means 9000 psi (62.0 MPa). Quality control, aggregate availability and...
Helicopter-Erected Tower Crane Demolishes Buildings
A signigicant logistics and scheduling problem existed for the demolition of these old buildings and the erection of a new one in the middle of an existing plant. Careful construction...
8-Story Building Moved to Avoid Wrecker's Ball
In Bogota, Colombia, a 7000 ton (15400kips) was moved almost 100 ft (30 m) to make way for a much needed highway arterial. Instead of wrecking the structure, an apartment building in a...