An Object-Oriented Simulation System for Construction Process Planning
This paper presents an object-oriented simulation system designed to integrate specific construction knowledge into construction process planning. Using the object-oriented representation,...
Site Layout: Where Should it Go?
Site layout is mostly treated as a task independent of other resource allocation tasks such as those that are traditionally associated with construction planning and scheduling. Yet, the...
Construction Technology/Method Identification and Selection System
The proliferation of construction technology and the characteristics of technology information, such as complexity, interdependency, etc., pose the need for a well-organized technology...
Resource-Driven Scheduling
As the project management techniques get applied to more and more human resource intensive projects, the topic of more effective resource planning has become one of the major issues in...
Integration of CAD and Material Control
The purpose of this paper is to address the relationship between CAD (Computer Aided Design) drawings and the material control software. Computer generated drawings have the ability to...
Smart Exception Reporting
Project control systems that contain a degree of 'intelligence' are possible with today's technologies. At the same time project controls engineers...
Radio Frequency Data Communication Applications in the Construction Industry
Construction operations produce substantial amounts of data resulting in seemingly growing amounts of paperwork for construction personnel. Not much can be done to diminish the amount...
Integration of Cost and Schedule Control
This paper presents cost control and schedule control relationships in an integrated manner for an activity/cost account that has a single output scheduled to be produced in a linear,...
Computer Assisted Claims Management and Preparation for Alternative Dispute Resolution (ADR)
Interest in improving dispute resolution has risen steadily in recent years. Several U.S. government agencies have begun experimenting with alternative means of dispute resolution, such...
Construction Quality Management
The Resident Management System (RMS) is a microcomputer based quality management and contract administration system designed specifically for resident engineers, by the Los Angeles District,...
A Knowledge Engr. System for Inquiry Feedback P.M.
The Knowledge Engineering Computer System for Inquiry Feedback Project Management was developed to augment existing project control systems by determining possible causes for delays and...
Environmental Engineering
This proceedings,
Ductile Frames Are Tough for Earthquakes
Implications of a new structural system in wharf design go far beyond San Francisco Bay, where two such wharves remained intact after the 1989 Loma Prieta quake. The design, introduced...
Development of an Expert System for Estimating Stream Reaeration Rates
This paper describes a data base of measured reaeration coefficients organized to assist users with estimating coefficients for rivers and streams with hydraulic characteristics similar...
Regional Water Supply Needs and Sources, Southwest Florida Water Management District
In 1990, the Southwest Florida Water Management District completed a district-wide water supply needs and sources planning analysis. The SWFWMD needs and sources analysis identifies water...
Yampa River Basin Alternatives Feasibility Study an Example of Conflict Resolution in Water Supply Development
The Yampa River, located in northwest Colorado, is a major tributary of the Green River segment of the Colorado River system. Potential water resource development in the Yampa River Basin...
Yazoo River Basin a New Direction for the Corps
The paper presents the lessons learned from the past events in the Yazoo Basin. The Yazoo Basin project is the only mechanism available that can provide the flood control that is needed...
Restructuring of Water Agencies in Salt Lake Valley, Utah
The Salt Lake Valley consists of a metropolitan area with a population of about one million. Wholesale domestic water supply is provided to this area by two main agencies, namely Salt...
Ultimate Air Rights
The new 1 million sq ft office tower at 450 Lexington Ave. rises from available space between commuter railroad tracks, through the center of a renovated four-story post office and up...
GIS Plans Wastewater Future
When the Public Works Department began phase 3 construction on Albuquerque, N.M.'s current wastewater treatment plant in 1990, it was time to begin thinking about the next...