A Microcomputer Dispersivity Evaluation Method for Thick Aquifers
The Littoral Environment Observation (LEO) program uses volunteer observers recruited to obtain daily visual observations of such coastal variables as breaker height, wave period, direction...

Hydropower's Newest Generation
Higher energy prices and strong incentives from the federal government have caused hydropower developers to consider sites that just a few years ago were scoffed at as mere trickles. Intense...

Transmission Tower Foundations in Weathered Rock
A case history is presented which discusses the siting, design and construction of the tower foundations for a transmission line in southwest Alaska. The project, completed in 1983, consists...

Forecasting the Demand for Electricity: An Examination of Alternative Approaches
This paper examines several approaches to forecasting national-level electricity demand. The various approaches are briefly examined, and the strengths and weaknesses of each are discussed....

Energy Forecasting Techniques: An Overview
This paper provides an overview of the primary forecasting techniques employed by electric and natural gas utilities to predict energy consumption and demand. Although the techniques discussed...

The Role of Demand Forecasts in Pacific Northwest Power Planning
This paper has two primary objectives: to acquaint a general audience with the basic approaches used to forecast the demand for electricity, and to discuss the role of demand forecasts...

The Impact of Demand-Side Management on Load Growth: Some Tentative Results
Demand-Side Management (DSM) programs including load management, conservation and strategic load growth are being implemented by a very large number of utilities for the mutual benefit...

Control of the Design Process
Gilbert/Commonwealth, Inc. (G/C) was the architect-engineer for the original design of the Florida Power Corporation (FPC) Crystal River Nuclear Plant, Unit 3 (CR3) and has been involved...

The Hydroelectric Barge
The nation's inland waterway system includes many low head locks and dams, with undeveloped hydropower potential estimated in excess of 1,100 MW. For most of these dams, hydro...

The PowerBarge Hydroelectric Plant
Following an account of the need for such an approach, the PowerBarge hydroelectric plant design concept is described as a fully floating system consisting of an Intake Barge, Siphon Penstock,...

Libby Rereg's Combined Spillway and Powerhouse
The existing powerhouse at Libby Dam, located near Libby, Montana has four generating units for a total of 420 MW. Provisions have been made which will allow doubling the plant rating...

It? Dam?Selection of Type
This paper describes the studies carried out for the type of dam selection for the Ita Hydroelectric Project. Drastic rainfall conditions, large river diversion flows and an abundance...

Structural Vibrations Associated with Large Incubation Tanks
It is the purpose of this paper to describe the format of an investigation wherein the train of evidence led from an assumption of a strictly mechanical cause to an actual cause that was...

A Summary of the Seismic Qualification Utilities Group (SQUG) Program
In December of 1980, the Nuclear Regulatory Commission (NRC) initiated Unresolved Safety Issue (USI) A-46 to address the question of the seismic adequacy of equipment in 49 operating nuclear...

Earthquake Experience Data on Power and Industrial Structures: Applications to Seismic Design and Evaluation
An extensive study was conducted to document the seismic performance of typical power plant and industrial structures in selected recent strong earthquakes and to correlate the performance...

Seismic Design-Qualification of Non-Safety Related Items in Safety Related Envelope
This presentation pertains to Seismic Design-Qualification for those portions of structures, systems, or components in a Nuclear Plant whose continued function is not required but whose...

Security Issues for Microcomputers
This paper addresses microcomputer security in the context of a transportation agency. Schemes for physical protection of hardware, such as locking workstations and alarms, are examined...

Evaluation of Accident Countermeasure Viability
Traffic and safety engineers are faced with the on-going challenge of maintaining acceptable levels of safety on the roads and streets under their jurisdictions. Generally, this challenge...

Water Quality Issues at Fossil Fuel Plants
This publication highlights proposed approaches and actual projects for dealing with such water quality issues at fossil power plants as water supply, water treatment, and the protection...

Energy Forecasting
When the traditional stability of growth in demand for electricity was disrupted in the mid-1970's, forecasters and planners were forced to reconsider their existing procedures....

 

 

 

 

Return to search