Industry Experience and Programs that Benefit the Monitored Retrievable Storage (MRS) Facility Design
The design objectives and criteria for an MRS must be responsive to the needs and concerns of the public and the industry. It is shown here that to the maximum extent, existing industry...

Economic and Technical Advantages of High-Temperature Processes in High-Level Radioactive Waste Management
The estimated waste management costs incurred for the three principal waste forms produced by reprocessing spent fuel are compared from a theoretical economic standpoint. The cost of vitrifying...

A Model for Effective Intergovernmental Planning
Effective intergovernmental planning processes are essential to the resolution of potential affects created by federal projects. In this paper, two successful planning efforts are described....

Opting for Cooperation?A Case Study in Siting a Low Level Radioactive Waste Management Facility
In 1986, the Canadian federal government called a halt to efforts by a crown corporation to site a low-level radioactive waste management facility when it became apparent that continuation...

The Standard Contract's Delivery Commitment Schedule Process
The Standard Contract for the Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste specifies various activities necessary for the eventual acceptance of spent nuclear fuel...

OCRWM'S Evolving Strategic Planning Process and the 1990 Plan
In 1990, the Secretary of Energy (Secretary Watkins) ordered that all 23 of the Department's major organizations adopt systems of strategic planning. This paper explains the...

Yucca Mountain Near Field Environment Considerations for Engineered Barrier System Design and Performance
Waste emplacement environment will be essentially dry for at least 300 years and will likely continue to be dry for more than 1000 years, both as a result of the unsaturated ambient conditions...

Geographic Information Systems Technology for Environmental Infrastructure Networks
The recent developments in the Geographic Information Systems (GIS) industry have captured the attention of many professionals who regularly deal with the management of real-world geographic...

Compaq Center East Water Management Plan
This Water Management Plan attempts to balance the many goals which were established in the Master Plan. Major areas of natural vegetation have been preserved. Stormwater quality pond/wetland...

Drainage Design Criteria: Too Restricted? Too Broad? Too Outdated?
Should drainage design policies be more flexible, leaving the field more open to engineering judgment? Are some policies too loose or broad? Should design criteria more closely reflect...

The Managemet of Storm Water Runoff Associated with Industrial Activity
Section 405 of the Water Quality Act of 1987 mandates that municipal and industrial storm water discharges are point sources of water pollution and are subject to regulation under the...

Parallel Real-Time Dynamic Simulation of Robots
To achieve real-time dynamic simulation of a robot manipulator on a vector/parallel machine, two types of parallelism are investigated. Techniques to enhance the vectorization of the dynamics...

Structural Engineering Lessons Learned From Hurricane Hugo
Hurricane Hugo purported to be 'The Storm of The Century' caused considerable property damage over a tremendously large area effecting nearly everyone and every...

Architectural Lessons Learned From Hurricane Hugo
All of us in the building design professions have learned many lessons in the last year since Hugo. My experience, as with many of us in the design profession in Charleston, has been on...

Offshore Oil and Gas Support Facility Siting Study
It has been estimated that the Bodega Basin, which extends offshore of Sonoma County, contains four areas of high potential for oil production, with a total of up tp 195 million barrels...

Land-Use Issues Raised by Offshore Oil and Gas Development
While prudent development of offshore energy resources may provide benefit to the nation overall, it invokes several issues for local and regional planning. In particular, petroleum development...

The Challenge of Meeting New Effluent Guidelines
Meeting new effluent guidelines is presenting a challenge to the environmental engineer. In most cases, existing plants must be retrofitted which will involve options of source treatment,...

Remedial Planning for the Former EXPO 86 Site
This paper describes the site characterization and remedial action planning effort that is being undertaken at the former EXPO 86 site in downtown Vancouver, B.C. The 200 acre site on...

Hazardous Waste Reduction?An International Perspective
Waste reduction has long been recognized as the preferred option for the management of hazardous wastes. As early as 1976, the United States Environmental Protection Agency (EPA) adopted...

Complete Recyling in the Organics Chemicals Industry
Regulations for both direct and indirect discharges have become so stringent in order to protect the environment that wastewater treatment and effluent levels in the organics chemicals...

 

 

 

 

Return to search