Comparison of Water Backwash and Brush Cleaning Systems for Vertical Panel Fish Screens
Vertical plate fish screens have been installed at a number of locations within the Pacific Northwest The vertical orientation of the screen panels requires screen cleaning systems designed...

Experimental Uncertainty and Measurement Errors in Hydraulic Engineering
The Task Committee on Experimental Uncertainty and Measurement Errors was formed to provide information and guidance on current practices used for describing and quantifying measurement...

Coastal Engineering Laboratory and Field Measurements: Some Uncertainties in Measurement
In this paper two examples of uncertainties which can occur in field measurements and measurements in coastal engineering models are examined. These examples are chosen to demonstrate...

Analysis of Exceptional Meteorological Conditions on July and August in Conakry
Conakry is a zone that receives more precipitation than other countries in West Africa. Sometimes the quantity is more than 4,000 mm per year. Strong rainfalls are observed between July...

Flooding from Rain-on-Snow Events in the Sierra Nevada
The most damaging floods in rivers of the Sierra Nevada of California have occurred during warm storms when rain fell in snow covered catchments. These large floods in the major tributaries...

Estimation of Flash Flood Potential for Large Areas
A methodology for determining the potential for flash floods in small basins within large geographical areas is presented. Geographical Information Systems (GIS) technology is used to...

1995: Where the Past (Paleoflood Hydrology) Meets the Present, Understanding Maximum Flooding
Paleoflood hydrology has become accepted in the scientific, engineering, and regulatory communities and increasingly is being used to complement engineering hydrology throughout the Rocky...

Potential-Scour Assessments at 130 Bridges in Iowa
A total of 130 highway bridges in Iowa were assessed for potential scour using a potential-scour index developed by the U.S. Geological Survey for a bridge-scour study in western Tennessee....

Monitoring Scour at Bridge Piers in Snohomish Co., WA
Washington State, Snohomish County Public Works Department is using a new Fixed Mechanical monitoring device, to augment its current program of monitoring scour at bridge piers. The Public...

Scour Study for Bridge Design on Temecula Creek
Channel-bed scour was studiedfor the proposed new Pala Road Bridge on Temecula Creek in Riverside County, California. In order to determine the general scour, sediment transport and potential...

Optimization of a Ground-Water Injection/Extraction System
This paper describes the application of linear programming to optimize the number, location, and rates of extraction/injection for a pump and treat system at a groundwater remediation...

Removal of Arsenic From Ground Water Using Granular Activated Carbon
Batch adsorption isotherm studies found that activated carbon (Hydrodarco, 14 X 40 mesh, American Norit) had removals of arsenic as high as 94% for a GAC dosage of 100 g/L and an initial...

Salinity and Hydraulic Issues at a Constructed Wetlands
A constructed wetlands at Boulder City, Nevada was designed to use effluent pumped from the City's wastewater treatment plant. The design was complicated by the highly permeable...

Constructed Wetlands for Metals Removal
Constructed wetlands have the potential to trap and remove metals contained in wastewater. Long term removal is expected to occur by accumulation and burial in the plant detritus in a...

South Florida Water Management District: Reconstructing the Everglades Ecosystem
Anthropogenic influences have reduced florida's Everglades over the last 140 years to a struggling remnant of its historic size and ecological potential. The State of Florida's...

The Importance of Plant Community Structure on Form and Function of Created Wetland Systems
If we consider that the creation and the restoration of a wetland system begins with the design of the hydrology, then establishing the form and function of a wetland begins with the design...

Hazardous Soil Remediation: A Cooperative Effort between Industry and Government
E. I. du Pont de Nemours and Company's Antioch Works (Dupont) is on the San Joaquin River 30 miles east of San Francisco, California. For about 25 years, ending in 1981, Dupont...

Vapor Phase Biofiltration for Removal of VOCs
The selection of an appropriate packing material for the biofiltration process is an important factor in the removal of contaminants from vapor phase. This study evaluates two different...

Enhanced Trichloroethene Desorption from Long-Term Contaminated Soil Using Triton X-100 and pH Increases
Laboratory experiments were conducted to study the effect of Triton X-100 and pH changes on trichloroethene (TCE) desorption from field-contaminated soil to water. In laboratory batch...

Geochemical Modeling of Lead in Vadose Zone
In recent years, researchers have used multicomponent reactive transport models to study the mobility of potentially toxic heavy metals in the subsurface. In this study, such a mathematical...

 

 

 

 

Return to search