Cost of Radon Control Measures in New Construction
Installation of a radon prevention system in new construction increases costs to builders and to homebuyers as well. Builders and/or their engineers will need to assess different approaches...
Development of a Sanitary Landfill Design in New Jersey?Why Proposed RCRA Changes are Not Going to Affect the Design
On August 24, 1988, the U.S. Environmental Protection Agency (EPA) proposed substantial revisions to Subtitle D of the Resource Conservation and Recovery Act (RCRA). In most states the...
Ft. Huachuca, AZ Fire Site Hazardous Waste Remedial Action
The paper discusses an investigation of the site of a major fire at Ft. Huachuca, Arizona. All of the fire debris contained asbestos. The sampling results confirmed that PCB levels of...
Closure of Hazardous Surface Impoundments and Creation of an On-site Permanent Disposal Facility?A Case History
Remington Arms Co. is currently undertaking a RCRA closure program for nine surface impoundments in Lonoke, Arkansas. The impoundments contain a variety of listed hazardous wastes from...
Preacquisition Environmental Site Assessments: Avoiding Common Errors and Omissions
The 1986 Superfund Amendments and Reauthorization Act (SARA) established an 'innocent-purchaser' defense to environmental liability from ownership of contaminated...
Computerized Data Processing, Displays and Groundwater Flow Analyses of the Stringfellow Hazardous Waste Site
Several types of data, maps, and figures were obtained from various sources involved in the investigations and monitoring at the site. This information was discretized, and a computerized...
Weathering of Constituents at Land Treatment Sites
The objectives of this research were to: 1) determine the leachability of metals and organics from soils at hazardous waste land treatment sites; 2) evaluate the mobility of hazardous...
Radioactive Mixed Waste at the Waste Isolation Pilot Plant
This paper discusses compliance by the U.S. Department of Energy Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico with the Resource Conservation and Recovery Act (RCRA) (1)....
An Evaluation of Hazardous Waste Land Treatment Closure Options
The purpose of this research was to evaluate changes in the persistence and mobility of the residues remaining when hazardous waste land treatment (HWLT) sites are closed. This evaluation...
Design and Implementation of a Risk-Based Remedial Action Program for Underground Tank Removal at a Dioxin-Contaminated Site
The unknown or uncertain conditions often inherent in hazardous waste site remediation projects complicate the job of the responsible professional to adequately assess and manage associated...
Economic Impacts of Storm Sewer Design Criteria
This paper discusses the selection of storm sewer design criteria and the resulting economic impacts. Using the Rational Method for calculating design flows, an investigation was made...
Flood Impact and Management of Levees in Tennessee
The construction of private levees is causing flooding and erosion problems along several tributary rivers in West Tennessee. The severity of these problems is recognized by the State...
Highway Erosion Remedial Measures
Soil erosion from highway ditches, cut slopes and fill slopes present a continuous problem to roadway designers, geotechnical engineers, and construction and maintenance personnel from...
Cold Regions Engineering
This volume contains papers that were presented at the 5th International Cold Regions Engineering Specialty Conference, sponsored by ASCE and held in St. Paul, Minnesota, February 6-8,...
Water Quality Monitoring of Highway Construction
The primary objective of water quality monitoring, as it relates to highway construction, is to obtain quantitative information to ensure that runoff from the construction site does not...
Groundwater Monitoring Network Design Using Coupled Monte Carlo Simulation and Optimization
This paper presents a method for the design, under uncertainty, of a groundwater well network for compliance monitoring at a waste disposal site. A numerical model of contaminant transport...
Application of Hydrodynamic and Water Quality Models at a Superfund Site in Montana
The water quality model applied to the site is the EPA-supported hydrodynamic and water quality model WASP4 with a modification to enable it to better simulate riverine systems. To provide...
Design, Construction and Testing of Repairs to the Low Level Outlets at Terzaghi Dam
Operation of the low level outlets (LLOs) at Terzaghi Dam in southwestern British Columbia resulted in severe cavitation at operating heads significantly lower than design. Modifications...
Geostatistical Global Estimates and Sampling Design
In the environmental assessment of a contaminated site, several different evaluation criteria could be considered such as: estimation of the overall average contaminant concentration in...
Geostatistics in Estimating Chemical Residuals at a Site
Kriging with generalized covariances is used to evaluate the effectiveness of remediation and cleaning of a contaminated site. The goal is to estimate: a) the amount of total volatile...
Return to search