Boston's Sewage Outfall
The centerpiece of the Boston Harbor cleanup plan will be the sewage plant on Deer Island, which will treat water from 43 municipalities in the Boston metro area�500 mgd to start. In order...

Getting the Lead Out
When officials from Omaha, Neb. announced an ambitious plan to revitalize an abandoned stretch of land along the Missouri River, the land itself presented one of the biggest problems....

The Long Climb to Remediation
During World War II, the Rocky Mountain Arsenal in Colorado served as an Army manufacturing center for the production, then destruction, of mustard gas, napalm, cluster bomb mixtures,...

Closing Hazardous Landfills
Designing and constructing covers for uncontrolled hazardous-waste landfills can pose some special problems�such as differential settlements as great as 50% of landfill thickness. Under...

Long Term Durability of Geomembranes
The most frequently asked question about geosynthetic materials is how long they will last. Precise answers, especially for geomembranes, elude researchers as well as manufacturers, design...

Building GIS Relationships Spatially and Politically
This paper advocates that the technological aspect of building a spatial GIS is not the critical factor for a successful multi-participant installation. Rather the political relationships...

Understanding Potential Legal Liabilities of Water Resource Professionals and How to Avoid Them
The salvation of the country's water resources is one of the most important problems facing it today. Focused, as they are, on a problem of such overwhelming significance,...

Spills on the Great Lakes a Cause for Concern?The Need for Action to Prevent Them
The present form of water transport of toxic chemicals on the Great Lakes, using inappropriate and obsolete forms of navigation control systems, presents the people and the ecosystem with...

Siting of a Reclaimed Water Reservoir
The City of Santa Rosa (City), California, retained Woodward-Clyde Consultants to identify, evaluate, screen and rank potential sites for construction of a dam and reservoir to store reclaimed...

Risk-Cost Analysis Under Uncertainty for Dredged Material Management
Fuzzy Composite Programming is used to conduct a risk-cost trade-off analysis under uncertainty for a simplified dredge material disposal problem. Uncertainties inherent in the components...

Forthcoming ASCE/WPCF Manual of Practice
The forthcoming ASCE/WPCF Manual of Practice for the Design and Construction of Urban Stormwater Management Systems includes, as Chapter 1, a derivation of the following text. This chapter...

Construction Contract Documents for Stormwater Facilities
This paper provides an overview of the elements of an acceptable package of contract documents for stormwater facility construction. Thoughtful an meticulous assembly of contract documents...

Pricing Policy for Water Services
Prices and pricing strategies are described in terms of their functions and revenue objectives applicable to water services. Ten pricing objectives are defined in terms of how the objective...

Issues in the Use of an Expert System for Teaching
This paper describes an expert system called SYSES which has been developed at the FIDS laboratory at the University of Manitoba. SYSES is intended to be a teaching aid for undergraduate...

Texas Reservoir Projects: Permitting & Mitigation
Recent reservoir projects in Texas were reviewed on the basis of permitting and mitigation, and subsequent project costs. We document trends of increasing time to prepare and process permit...

Summary of the National ASCE Task Committee on Costs-Benefits of Various Design Frequencies for Urban Drainage Systems and Flood Control
The National ASCE Task Committee on: 'COSTS-BENEFITS OF VARIOUS DESIGN FREQUENCIES FOR URBAN DRAINAGE SYSTEMS AND FLOOD CONTROL' recommends that public officials...

Diagnostic Options for Pipeline Rehabilitation
The various diagnostic options utilized for solving pipeline problems/failures continue to increase at a very rapid pace. Field reconnaisance and/or man-entry of pipelines is becoming...

Parallel Real-Time Dynamic Simulation of Robots
To achieve real-time dynamic simulation of a robot manipulator on a vector/parallel machine, two types of parallelism are investigated. Techniques to enhance the vectorization of the dynamics...

Application of Artificial Neural Networks to Composite Ply Micromechanics
Artificial neural networks can provide improved computational efficiency relative to existing methods when algorithmic description of functional relationships is either totally unavailable...

A New Finite Element Formulation of the Generalized Laminated Plate Theory
The Generalized Laminate Plate Theory (GLPT) predicts stress distributions in laminated composite plates with accuracy comparable to a full three-dimensional analysis. The original implementation...

 

 

 

 

Return to search