Bi-Directional Load Testing of Shafts to 6000 Tons
This paper describes the use of Osterberg cells (O-cells) to perform bi-directional load testing on full size production drilled shafts for a major bridge foundation near Owensboro, Kentucky....

HUD Concerns: Post-Tensioned Foundations in Texas
An investigation was conducted of post-tensioned slab foundation systems in Texas pursuant to a request from the Headquarters Office's of the U.S. Department of Housing and Urban Development...

Performance of Horizontal and Vertical Barriers
Horizontal and vertical barriers have been used on transportation facilities to control expansive soils and minimize their damages. The effort is to minimize moisture change in the soil...

Can the U.S. Compete?
Though some American firms, particularly those providing turnkey delivery systems, are very competitive abroad, as a rule U.S. engineering and construction firms face daunting obstacles...

Automated People Movers IV
This proceedings, Automated People Movers IV, includes 72 papers presented at the Fourth International Conference on Automated People Movers...

Geographic Information Systems and their Application in Geotechnical Earthquake Engineering
This proceedings, Geographic Information Systems and their Application in Geotechnical Earthquake Engineering, consists of short papers submitted...

Waterpower '93
This proceedings contains the papers presented at the Waterpower '93 conference held in Nashville, Tennessee, August 10-13, 1993. The conference brought together owners, planners,...

Vietnam: Worth Looking Into
If it is to enter the world economy, let alone play catch-up with the booming economies of some of its neighbors, Vietnam requires massive numbers of infrastructure projects: roads, bridges,...

Engineering Sustainable Development
Despite some isolated environmental victories in the past few decades, on a system-wide level the problems�from acid rain to destruction of the rain forest�are getting worse. Can humanity...

Guidelines for PC-Based Data Acquisition Systems for Hydraulic Engineering
Guidelines for PC-Based Data Acquisition Systems for Hydraulic Engineering reviews the state-of-the-art in personal computer-based data acquisition...

Tying Up The Artery
After six years, preliminary design is almost complete on one of the nation's largest, and most complicated, public works project, the Boston Central Artery project. At an...

Airport Towers: A New Generation
Airport control towers are a unique building type with monumental significance, both for the cities that own and operate the airports, and for the FAA which owns and operates them. Airport...

So Much Pavement, So Little Time
At its most basic, pavement management requires taking inventory of a pavement network, doing a condition assessment, setting up a database, then synthesizing the data collected for an...

Egypt's Real-Time Water Management
The challenge and complexity of efficiently managing the distribution of the 55 billion m that Egypt draws from the Nile every year has prompted the country's Ministry of...

Geosynthetics Conquer the Landfill Law
Los Angeles' last operating landfill is undergoing a major expansion using innovative materials in the liner system to overcome difficult site conditions. The design represents...

Overcoming the Woes of Worldwide Work
The author, a civil engineer based in Gibraltar, discusses a variety of pitfalls encountered in international practice, with case histories and lessons learned. They can be caused by differences...

High-Performance Construction Materials and Systems
An Essential Program for America and Its Infrastructure?Executive Report
Prepared by American Concrete Institute; American Institute of Steel Construction; American Iron and Steel Institute; ASCE; Civil Engineering Research Foundation; Concrete Research and...

Lessons Learned from Elk Creek Dam
This is the third of a series of papers published on the design and construction of Elk Creek Dam. The first paper discussed design and construction concepts to provide water tightness...

Concepcion Dam Design & Construction Problems and Their Solutions
Concepcion Dam is a curved axis gravity structure 68 m high and 695 m long. It supplies water to Tegucigalpa, the capital of Honduras. The dam contains 290,000 cubic meters of RCC. Challenges...

Construction of Urugua-I RCC Dam
Considerations concerning the RCC construction process and its relation with the design and quality are analyzed. The paper contains topics related to the experience obtained at Urugua-i...

 

 

 

 

Return to search