BRASS Modeling of Lo?za Reservoir, Puerto Rico, for Sediment Management Operations
Loiza reservoir, the principal water supply for metropolitan San Juan, delivers 3.5 m3/s (80 mgd) to the Sergio Cuevas filter plant. Sedimentation...
Infrared Thermographic Sensing of Sewer Pipeline Problems
When a sewer caves in, it often takes the street, sidewalks, and surrounding buildings along for the ride. These collapses endanger public health and safety. Repairing a sewer before such...
Computing in Civil Engineering and Geographic Information Systems Symposium
This proceedings consists of the papers presented at the Eighth National Conference on Computing in Civil Engineering and Geographic Information Symposium, held in conjunction with A/E/C...
Engineering, Construction, and Operations in Space III
This proceedings,
Engineering Mechanics
This proceedings,
Site Impact Traffic Assessment
Problems and Solutions
Transportation needs have traditionally derived from land use decisions. Site impact traffic analysis is a formalized process that attempts to quantify the need for transportation improvements...
Investigation of a Concrete Blistering Failure
During construction of a concrete pavement at a military airfield, numerous small blisters formed on the concrete surface behind the slipform paver and were filled by the contractor using...
Standard Methodologies for the Forensic Investigation of Pavements
The high costs of new construction have made the preservation and restoration of existing pavements an attractive alternative to replacement structures. Existing pavements that are to...
An Airfield Pavement Forensic Analysis: Cairo East Air Base
The US Army Engineer Waterways Experiment Station (WES) was requested by the Middle East/Africa Projects Office in April 1989 to provide technical assistance in analyzing an unstable asphalt...
Forensic Analysis of a Two-Component Joint Sealant Using FTIR-ATR
Fourier-Transform Infrared Spectroscopy using Attenuated Total Internal Reflectance (FTIR-ATR) was used to chemically identify joint sealants obtained from an airfield pavement joint which...
Principles of Infrared Thermography and Application for Assessment of the Deterioration of the Bridge Deck at the Zoo Interchange
This paper details the principles of infrared thermography from the underlying theoretical considerations to the physical constraints involved with performing the test. Infrared (IR) thermography...
Procedures for Evaluating Aggregate Gradation Specifications
The construction and rehabilitation of transportation facilities annually consumes huge quantities of aggregates. And, the variability in supply and demand for these materials as well...
Overview of Permeable Bases
Drainable pavement systems consist of: permeable base, separator lyer, and edgegrain system. This paper focuses on permable bases. A permeable base must provide both permeability and stability....
Forensic Analysis Techniques for Joint Sealants
Growing concerns involving the field performance of pavement joint sealant materials has illustrated the need for forensic capabilities in determining the cause of sealant failures. Methods...
Implementation of Material Requirements in Specifications
This paper focuses on where to find information on materials, their compatibility, minimum standards and specifying of materials and their use. The paper also presents case histories on...
Performance of Free Draining Base Course at Fort Campbell, Kentucky
In 1990 a free draining base course layer was constructed in the structural section of a pavement to be used as a military vehicle maintenance yard at Port Campbell, Kentucky. The Corps...
Probabilistic Mechanics and Structural and Geotechnical Reliability
This proceedings consists of summary papers for the thirty-six technical sessions of the 6th ASCE Specialty Conference on Probabilistic Mechanics, and Structural and Geotechnical Reliability....
Stability and Performance of Slopes and Embankments II
This proceedings,
From Sludge to Brokered Biosolids
At the end of June, a sludge filled barge pulled away from New York harbor for the last time. It traveled more than 100 mi offshore, where workers unloaded some of the 355 dry tons of...
Portrait of a Manager
Although some are born leaders, most managers are actually created. In a perfect world, the young engineer would receive a bachelor of science degree in civil engineering, specializing,...
Return to search