Bed Topography and Sorting in Alluvial Channel Bends
A quasi-three-dimensional model has been developed for the purpose of calculating the velocity distribution, the bed topography and sediment sorting along channel bends. The depth-averaged...
Surface Roughness with Erosion of Earth Channels
A determination of the stresses effective in soil detachment is essential in determining erodibility. The soil roughness that exists during testing and in natural channels is a key element...
Hydraulic Mechanisms of Riverbank Erosion
Recent efforts are described to develop an improved understanding of bank failure due to piping in noncohesive layers in riverbanks. The efforts included field surveys and laboratory tests....
Geotechnical Aspects of River Bank Erosion
The principal geotechnical mechanisms of river bank failure are identified on the basis of extensive field investigations on many different river systems. The role of each factor depends...
Incremental Damage Assessment (IDA) For Lake Darling Dam
An Incremental Damage Assessment (IDA) has been completed for Lake Darling Dam, located on the Souris River, near Minot, North Dakota [1]. The IDA has indicated that a reduction in flood...
Peak Outflow From a Breached Embankment Dam
A relation for rapidly predicting the peak outflow rate from a breached embankment dam has been presented. The prediction equation is based on reliable data from 19 embankment dam failures...
An Ongoing Investigation of Residual Suspended Material Transport in Central San Francisco Bay, CA
A study of suspended material transport in San Francisco Bay, California, is presently underway by the U.S. Army Corps of Engineers. This paper describes preliminary numerical model and...
Risk-Cost Principles for Dam Safety Analysis
The purpose of this paper is to present the principles and issues of risk-cost analysis as they have evolved in the evaluation of dam safety improvements. The paper also reviews some results...
Impact of Risk-Based Analysis on Hydrologic Design Practices
This paper provides a brief review of the current hydrologic design practices of the U.S. Army Corps of Engineers (USACOE) for safety inspection of dams and the current hydrologic design...
Water Distribution System Design Considering Component Failure During Static Conditions
A continuous hydraulic availability relationship is presented which more realistically models minimum pressure requirements for water distribution systems. This relationship is used in...
Hydraulic Analysis of the Schoharie Creek Bridge
Ten people died on April 5, 1987 as a result of the collapse of two spans of a New York State Thruway bridge into the floodwaters of Schoharie Creek. The cause of the bridge failure was...
Risk Assessment of System of Dams
The application of risk assessment to a series of dams on a river is presented here. A general discussion of the basic principles of risk assessment approach to dam engineering is given...
The Tides Effects on the Dam Break Flood Wave
The accuracy of water level predictions downstream of the dam is dependent upon the breach evaluation, the correct estimation of the roughness coefficients and when the flood wave reaches...
Rule Curve Operation at Terzaghi Dam to Pass the Probable Maximum Flood
Terzaghi dam is located on the Bridge River, a tributary of the Fraser River. The spillway was originally designed for the 1000-year flood. Probable Maximum Flood (PMF) studies completed...
Some Pertinent Considerations in Dam and Reservoir Design
Two important considerations in designing and constructing a multipurpose earthdam and reservoir are to minimize losses in the event of dam failure because of overtopping, and to conserve...
Design and Construction of the Moose River Hydroelectric Project
The project's main features are: a 7 ft high, 240 ft long cast-in-place concrete overflow weir; bell mouth entrance concrete intake structure with trashrack and trashrake;...
Update: Ozark-Webbers Falls Turbines
The Ozark and Webbers Falls powerhouses were designed and constructed under the supervision of the U.S. Army Corps of Engineers. Both are located on the McClellan-Kerr Arkansas River Navigation...
Reduced O&M Costs through Better Metallurgy
There are many areas in hydroelectric power plants where better materials of construction can reduce operation and maintenance (O&M) costs. Some of the most nagging problems deal...
Analyses of the Lower San Fernando Dam Failure
The main methods employed for the back analysis of the behaviour of the Lower San Fernando Dam during the 1971 earthquake are described. The requirements for a comprehensive analysis are...
Asphalt-Rubber Concrete?A New Horizon
The performance of asphalt concrete pavements is dependent to a large degree upon the rheological properties of the asphalt binder. Asphalt-rubber as a binder material extends the temperature...
Return to search