Earth Pressure on Underground Concrete Pipe in a Field Test
The cause of cracking at the sheetpile extraction in concrete pipes buried by the open excavation method was investigated by loading tests on the pipe and a field test carried out by Osaka...

Seismic Pope Support Construction Practices
During the mid 1970's the regulatory agencies controlling the design and construction of nuclear power plants began to demand stricter adherence to already existing codes...

The Prudency Management Audit: A New Challenge for the Civil Engineer
The Nuclear Industry, particularly utilities and their constructor, engineering and vendor agents, is faced with a surging increase in Prudency Management Audits. Such Audits are often...

Local Pressure in Ice-Structure Interactions
Two models for the determination of local pressures during marine ice or iceberg collisions with bottom-founded structures are presented. The first model is a two-dimensional analytical...

Finite Element Methods in Structural Safety Studies
The use of finite element methods in structural safety studies is discussed and recent work in the area is briefly reviewed. Formulation for a first-order stochastic finite element method...

Stochastic Beams on Elastic Foundation
The finite difference method is applied to the second-moment analysis of beams on elastic foundation with random characteristics. The method is simpler than the stochastic finite element...

Design Load Combination Factors
This paper reviews alternative load combination formats for ultimate limit states in codified structural design. The need for explicit consideration of load-time variations and random...

Bentonitic Slurry in Constructing Drilled Piers
Bentonitic slurry is employed extensively in the construction of drilled shafts. While serious problems can occur, evidence is presented to show that the proper use of slurry will lead...

Installation of Category I Caissons
Founding a proposed safety-related Category I structure of a nuclear power plant on rock socketed caissons necessitated using precision installation techniques. These techniques were chosen...

Observations on Load Tests for Drilled Shafts
This paper focuses on three specific areas pertaining to load tests for drilled shafts: 1) basic considerations and load testing procedures, 2) interpretation of uplift load test information,...

Quality Assurance/Quality Control; Case Studies?Introduction
The report emphasizes several requirements for quality management: a. The need for a knowledgeable field representative, preferably the resident engineer. This person must be familiar...

Quality Management in the US Army Corps of Engineers: An Evaluation
Quality management programs are employed to assure the achievement of specific standards of performance. In the construction industry, quality management personnel face common problems...

Managing Quality into the Workplace
In February, 1983, the author's organization began a process designed to enhance attitudes about quality in every individual member of the organization. The process requires...

South Branch Rockaway Storm Water Management Study
The Division of Water Resources of the New Jersey Department of Environmental Protection, the Hunterdon Soil Conservation District, the United States Department of Agriculture's...

An Ecosystem Approach to Watershed Management
An example is drawn from the Little River Research Watersheds near Tifton, Georgia. Riparian hardwood forests (low management) and upland agricultural fields (high management) are the...

Assessing Risks of Impaired Hydrologic Function
This paper describes the rationale and use of a 'resource tolerance' to evaluate hydrologic function and presents a method to establish a relative tolerance threshold...

Erosion, Productivity and Rangeland Watershed Planning
The Bureau of Land Management is responsible for the management of over 160 million acres of rangeland in the western United States. The principal uses of these rangelands are the grazing...

Avoiding Lengthy and Costly Litigation by Negotiating Alternative Dispute Resolution Methods
A 'hot issue' in the construction industry today is the negative aspects perceived from wide arbitration use over the last 15 years. Although hearings usually...

Techniques of Negotiation
Three primary qualities are necessary for effective negotiation: knowledge, attitude, and skill. The author's firm has successfully used a negotiating team approach. This...

Abutment Seepage at Smithville Dam
After initial filling there was concern for the stability of Smithville Dam when higher than anticipated piezometric levels were experienced in the left abutment foundation. Concern heightened...

 

 

 

 