An Engineered Reactor Approach to Integrating Physicochemical and Biological Processes for In-Situ Bioremediation of Contaminated Subsurface Systems
The concept of integrating biologically active granular carbon reactors into groundwater recycle schemes to provide continuous acclimation and enrichment of microorganisms and inoculation...
Separation of Organics from the Aqueous Phase Using Polymeric Resins
The adsorption of tetrachloroethene (PCE) onto several polymeric materials is reported and compared to activated carbon F-400. In addition, the bisolute adsorption of chloroform and trichloroethene...
Evaluation of Sludge Screening and Screenings Dewatering Technologies
The concept of digested sludge screening has been utilized at the City of Los Angeles' Hyperion Treatment Plant to remove extraneous objects, hair, and fibrous material in...
Constructed Wetlands at Mesquite, Nevada
Subsurface flow (SF) wetlands are used to provide effluent polishing following treatment in an aerated lagoon at Mesquite, Nevada. General SF wetland design methodology is discussed in...
Composite Liner, Leak Detection System, and Floating Cover for Nuclear Reactor Emergency Retention Basins
Existing reactor effluent basins are being retrofitted with composite liners, leak detection system and floating covers. Such basins have a 15-year life and remain empty until an accident...
A New Graphic Technique for Reporting Soil Quality Analyses
Boston's Artery/Harbor Tunnel Project is currently the United States' largest highway construction project. One of its major issues is the disposal of an estimated...
Project Peer Review Guidelines
Breaking Down the Barriers
The structural engineering of multistory buildings is a complex and time-consuming chore, but new design and analysis tools can greatly simplify the task. The article traces the development...
LRFD: Still Waiting
Introduced in 1986, load and resistance factor design (LRFD), has a way to go before it becomes standard practice for steel design. LRFD-based design typically results in savings on gravity...
Using Project Management Techniques in Hydro-Relicensing
To answer a pressing need for managing today's complex process and requirements of hydro relicensing, Central Maine Power Company (CMP) has applied the principles of project management,...
Foundation Investigations of Concrete Dams
This paper discusses a series of foundation investigations conducted on concrete dams by Pacific Gas and Electric Company. The paper focuses on investigative techniques, equipment, appropriate...
Uplift Pressures and Strengths for Concrete Gravity Dams
This paper presents an overview of the results of a three year study to compile a database of stability parameters and foundation characteristics for older concrete gravity dams. The database...
Cone Penetration Testing: Cost Effective Soil Exploration
On reviewing the 1987 Part 12 Dam Safety Inspection Reports for the Wisconsin River Power Company's Petenwell and Castle Rock Dams, the Federal Energy Regulatory Commission...
Double Radial Gates for the Brunau Ice-Retention Weir in Switzerland
During the springtime thaw, the River Sihl, which flows from the south into the city of Zurich, Switzerland, carries large quantities of ice flow. In 1968, to protect the footings of a...
Composite Materials Show Promise for Clean Kaplan Runners
In order to prevent any possibility of oil leakage into river water, LMZ manufactured Kaplan runners containing oil in the blade servomotor only, while the blade operating mechanism operates...
Laboratory and Field Experience with Cavitation Monitoring of Hydroturbines
When control of cavitation erosion can be accomplished by changes in operating conditions, real-time monitoring of cavitation level is a valuable tool. Three types of cavitation monitors...
Cavitation Noise Investigation of a Pump-Turbine
The results from cavitation noise detection measurements on a 35 MW pump-turbine are presented. Detailed information about the cavitation noise is determined including three-dimensional...
Dynamics of Protective Coatings to Limit Cavitation Damage
Cavitation implosions inflict a very high impact stress on turbine blades and turbine liners. One strategy for limiting the impact on the turbine components is to overlay a protective...
New Interior Lining for Welded and Riveted Penstocks
Pacific Gas and Electric Company (PG&E) has 73 hydroelectric power facilities installed throughout its distribution system. Each of these facilities has at least one penstock,...
Development of Hanford Site Lysimeter Facilities
Lysimeters have been constructed at the Hanford Site near Richland, Washington to quantify mechanisms that affect migration of radioactive and hazardous waste in geologic media. The history...