Underground Building Reclaims a Landfill
Oregon's Multnomah County built a road and maintenance facility underground to begin reclaiming an old landfill site. More than 600 precast concrete components make up the...

Rail and Road Traffic Continue During Bridge Modification
The crossing of Route 15 under the Bangor and Aroostook Railroad Bridge, Bangor, Maine had limited sight distance and marginal clearances. Maine Department of Transportation, therefore,...

Application of Methods of Probabilistic Characterization of Soil Properties
The use of probabilistic methods to describe soil properties has many applications. One such application that has been developed is in the area of probabilistic slope stability analysis....

River Lock Rehab: A Winter's Tale
Lock & Dam �1 on the Mississippi River between Minneapolis and St. Paul had deteriorated badly but the U.S. Corps of Engineers determined that replacement with a new structure...

Repair�Don't Replace�Cracked Sewer Pipe
Approximately 0.5 mile (0.8 km) of 42 in. (1,07 m) diameter reinforced concrete was installed for a sanitary sewer project when the on site inspector discovered that numerous joints had...

A Look at the New ACI Concrete Code
Building Code Requirements for Reinforced Concrete (ACI 318-83) is discussed in terms of three major changes: limitations on chlorides, especially in aggregates, that affect durability;...

LAX Takes Flight for the 1984 Olympics
LAX (the Los Angeles airport) had over two dozen contractors working on site to complete their $700 million improvement plan in time for the Olympics in July. They also came up with several...

The Sand Dam
Currently under construction is the 443 ft. high sand fill dam. Being erodible, pervious and liquefiable, sand would normally be considered as n unsuitable material to construct LaVueltosa...

Performance of Water and Sewer Lifelines in the May 2, 1983 Coalinga, California Earthquake
Water supply and filtration systems for the City of Coalinga suffered little damage. The water transmission system suffered five breaks. The urban distribution system was disrupted, but...

Water Supply
The Foothills Project adds 125 mgd (5.5 m�/s) to the Denver area water treatment capacity, and saved approximately $1 million in energy costs in the first year of its operation. The $163...

Prefab Power
The Love Hydroelectric Generating Station, owned by the city of Vanceburg, Ohio, was prefabricated in France complete with all components, brought across the Atlantic and towed to Greenup...

Caisson
The Jamaica Bay Water Pollution Plant was renovated and upgraded from l973-l983 and included sinking a 116 ft. x 105 ft. caisson 50 ft. deep adjacent to city streets and buildings. The...

Hydro Power
The Kerckhoff 2 Hydroelectric Power Projects adds 140 MW to the capacity of the San Francisco area's Pacific Gas & Electric system. No new dam was needed; only a 4-mile...

Flood Control
The Hamilton and Riemer reservoirs were constructed by excavating pits below grade to receive flood overflows from adjacent streams. The two reservoirs are part of a 52 sq. mile (135 km�)...

Pipe Impact on Concrete Slabs
A series of pipe impact on concrete slab tests have been performed at the CEA's Cadarache Laboratory using the AQUITAINE II facility. The testing program was jointly sponsored...

Design for Whipping Pipe Impact on Reinforced Concrete Panels
This paper describes determination of local and overall effects on reinforced concrete panels due to whipping pipe impact in postulated pipe break events. Local damage includes the prediction...

Low Velocity Impact Tests on Reinforced Concrete Panels
The results of low velocity impact tests on reinforced concrete panels are presented. These tests were conducted to investigate the behavior of reinforced concrete flexural elements subjected...

Reliability Assessment of Indian Point Unit 3 Containment Structure Under Combined Loads
In the current design criteria, the load combinations specified for design of concrete containment structures are in the deterministic format. However, by applying the probability-based...

Seismic Capacities of Masonry Walls at the Big Rock Point Nuclear Generating Plant
An evaluation to determine the ability of selected concrete block walls in the vicinity of essential equipment to withstand seismic excitation was conducted. The seismic input to the walls...

Major Considerations in Scale Modeling of Reinforced Concrete Containment Structures
Reinforced concrete containment structures pose unique modeling problems, especially when leakage integrity is of interest. This paper presents a general discussion of modeling considerations...

 

 

 

 