Examining the Capitol Dome
The dome of the United States Capitol, designed and built from the 1850s to the 1860s, is a masterpiece of 19th-century engineering and construction. The majority of the dome is made of...
Quality in the Constructed Project
A Guide for Owners, Designers, and Constructors
This Second Edition of
Verdict Rendered
After the Grays Harbor County Courthouse in Montesano, Washington, was severely damaged by an earthquake in 1999, the surrounding community decided to preserve it. A design/build approach...
Design Live Loads for Parking Garages
The objective of this research project is to obtain a better understanding of parking garage live loads and to recommend an appropriate value for design. A load survey was conducted in...
The SPRP Project: An Overview
The National Science Foundation's Office of Polar Programs (OPP), the lead agency for the U.S. Antarctic Program, has begun construction of a replacement station for the Amundsen-Scott...
The Rationale for Above-Surface Facilities
The redevelopment of the U.S. Amundsen-Scott South Pole Station�currently in the beginning phases of construction�will include the largest and most ambitious example of an elevated station...
Natural Hazards Review
The Natural Hazards Review stands on the realization that natural disaster losses result from interactions between the physical world, the constructed environment, and the character of the societies and...
Defining the Manual's Audience, Content, and Level of Detail
Often, the technical writers assigned to prepare an O&M manual aren't technical writers at all, but members of the facility design engineering staff. While they may...
Estimating, Scheduling, and Producing the Manual
Producing an O&M manual can be a challenge. All activities must be coordinated properly and the manual production team must work together to get the job done on time and within...
Equalizing Wet Weather Flows
Sanitary sewer overflows and combined sewer overflows can wreak havoc on communities by flooding basements, contaminating drinking water sources and recreational water bodies, and flowing...
Banking on Bioengineering
Geoenvironmental engineers have traditionally used riprap to protect streambanks and river banks from erosion. In recent years, however, river regulators, permitting agencies, and county...
Holding Court
Contractors had their work cut out for them when structural engineers specified concrete-filled steel tubes for the Thomas F. Eagleton Federal Courthouse's perimeter columns....
Isolating the Arts
The LG Kangnam Building in Seoul, Korea, is a multi-use, 140,000 sq m project, consisting of a 40 story, 183 m tall office tower, an adjacent 9-story acoustically base-isolated performing...
Structural Surgery
Structural engineers had to transform four existing buildings and two new buildings into a new non-profit center for Jewish history. The buildings were of varying ages and had different...
Through Frozen Ground
The most difficult section of the Massachusetts Bay Transportation Authority's (MBTA) Silver Line transit corridor project is approximately 112 m (400 ft) of tunnel below...
Scaling the Monument
One of the three phases in the restoration of the Washington Monument was the design and construction of an aluminum scaffolding system with both functional and aesthetic purposes. The...
Dam Breaching: The Rest of the Story
The U.S. Army Corps of Engineers is evaluating the possibility of breaching four dams on the lower Snake River to improve salmon migration. Because significant infrastructure modifications...
Metal Building Systems: A New Look
The use of metal building systems in low-rise, non-residential construction under 150,000 square feet has grown from less than 50 percent in 1986 to almost 70 percent today. Such systems...
Energy Unleashed
The U.S. Army Corps of Engineers discharges a mean daily flow of 2,000 cu ft/s (57 m�/s) under a gross head of 280 ft (85 m) through four Howell-Bunger valves at the Summersville Dam in...
Resolution Solutions
Disputes over such issues as change orders, extra work, delays, or defective work are an inescapable part of the construction process. By designing an effective dispute management program...
Return to search