Very Long-Term Care of Mechanically Stabilized Earth Berms: Limiting the Liability of Future Stakeholders
Since their development over 50 years ago, civil engineering applications of mechanically stabilized earth (MSE) berms have significantly increased. When used as a component of an asset...

Geosynthetic Materials Help Build Optimized Infrastructure
In recent years, the world has begun to realize the negative impacts that limited infrastructure can have on economic growth and the well-being of humankind. Our infrastructure challenges...

Microtunneling Operation
The shaft should provide safe working conditions and fully support the ground. Jacking and receiving shaft support system and sizes are typically determined by the contractor. See Chapter...

Shafts/Temporary Structures
Shafts should be of a size to accommodate the equipment and pipe selected and to allow for safe working practices. If the shaft must accommodate the permanent works, it is the contractor's...

Regulations
The contractor should meet federal, state, and local regulations. The contractor is responsible for jobsite safety....

Conduct of Operational Hail Suppression Projects
Those conducting hail suppression operations should be vigilant and always prepared to react when potential hailstorms begin to develop. In this chapter, some guidance is provided for...

Managing Geotechnical Assets to Improve Highway System Performance
As geoprofessionals, we have a great opportunity to look at our work in new ways and to show its value to others. Highway agencies are looking to get the most from their assets and with...

Multi-scale Health Assessment for Effective Levee Management
Researchers are working on developing a new health assessment framework with the potential to modernize our ability to monitor, manage, and ensure the safety of levees and other systems...

Risk-based Methods for Geotechnical Features in Transportation Asset Management
The purpose of asset management is to meet life cycle performance goals through the management of assets in the most cost-effective manner. In developing risk-based, asset management plans...

The Transbay Transit Center: Breaking New Ground in Urban Geotechnics
A building boom centered around the construction of the new Transbay Transit Center (TTC) is transforming the South of Market neighborhood in downtown San Francisco, newly dubbed the Transbay...

Design-Build and Public-Private Partnerships: Risk Allocation of Subsurface Conditions
Project Owners, especially in the public sector, are exploring and utilizing alternative project delivery methods, such as design-build (D-B) and public-private partnerships (P3s). Some...

Transbay Transit Center: Innovations in Automated Monitoring
The new Transbay Transit Center will include a multimodal terminal serving 11 transit systems and future high-speed rail from San Francisco to Los Angeles/Anaheim. This is an ambitious,...

Structures Congress 2012
Forging Connections in the Windy City
Proceedings of Structures Congress 2012, held in Chicago, Illinois, March 29-31, 2012. Sponsored by the Structural Engineering Institute of ASCE. Structures Congress 2012 contains 202...

Design of Urban Stormwater Controls
Fully updated to address the paradigm shift in the way stormwater is viewed and managed, Design of Urban Stormwater Controls focuses on consolidating technologies to foster a convergence...

GeoHunan 2011
GeoHunan 2011 contain Geotechnical Special Publications nos. 212-223. These 12 Geotechnical Special Publications consists of 361 papers on geotechnical engineering for transportation infrastructure...

Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
The Journal accepts papers and articles spanning legal issues and litigation pertaining to all areas of engineering and construction, including contract law and interpretation; professional liability and...

Safety Considerations
This chapter discusses the main hazards associated with the inspection and renewal activities for culverts and storm sewers....

Incorporating Site Characterization Data into Contaminant Concentration Interpolations for Long-Term Monitoring Optimization
Long ? term monitoring (LTM) networks are installed for groundwater remediation systems to evaluate the performance of various remediation processes and to track the variation of contaminant...

Domestic-Well Water-Quality Data and Reports for the Environmental Public Health Tracking Network: USGS and CDC Collaboration
The mission of the Environmental Public Health Tracking (EPHT) Program is to provide information from a nationwide network of integrated health and environmental data that drive actions...

Considerations Regarding Geochemical Transformations Downstream of Subsurface Wastewater Effluent Disposal Facilities
Many suburban and rural communities use subsurface disposal in conjunction with on-site and other small decentralized systems. In addition, to reduce the impacts of wastewater treatment...

 

 

 

 

Return to search